<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Cantiere Nuovo Gaslini</title>
	<atom:link href="https://cantierenuovogaslini.gaslini.org/en/feed/" rel="self" type="application/rss+xml" />
	<link>https://cantierenuovogaslini.gaslini.org/en/</link>
	<description>Il Cantiere Nuovo Gaslini, progetto di riorganizzazione e potenziamento dell’Istituto, attraverso la realizzazione del Padiglione Zero e la ristrutturazione di alcuni padiglioni esistenti, consentirà di potenziare l&#039;offerta dei servizi della struttura ospedaliera, in modo da garantire una migliore assistenza ai pazienti, ottimizzando l&#039;efficienza delle cure e consentendo una maggiore capacità di accoglienza.</description>
	<lastBuildDate>Thu, 16 Nov 2023 09:54:55 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.5</generator>

<image>
	<url>https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cropped-favicon-1-32x32.png</url>
	<title>Cantiere Nuovo Gaslini</title>
	<link>https://cantierenuovogaslini.gaslini.org/en/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero</title>
		<link>https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 23 Oct 2023 22:08:45 +0000</pubDate>
				<category><![CDATA[comunicato stampa]]></category>
		<guid isPermaLink="false">https://www.cantierenuovogaslini.org/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/</guid>

					<description><![CDATA[<p>Firmato l’accordo di concessione delle aree per la costruzione: partono i cantieri di lavoro per la costruzione del Nuovo Gaslini.</p>
<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/">Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_0 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_0">
				<div class="et_pb_column et_pb_column_1_2 et_pb_column_0  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_0 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					
				</div>
				
			</div>
			</div><div class="et_pb_column et_pb_column_1_2 et_pb_column_1  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_1 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					<h1 class="entry-title">Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero</h1>
				</div>
				
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_1">
				<div class="et_pb_column et_pb_column_3_4 et_pb_column_2  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_0  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><i><span class="">The concession agreement for the areas for construction has been signed: the work sites for the construction of the Nuovo Gaslini begin.</span></i></p>
<p><em>Genoa, 23 October 2023.</em>  Work on the construction of the &#8220;Nuovo Gaslini&#8221; has started: the <strong>IRCCS </strong> <strong>Istituto Giannina Gaslini </strong> signed the agreement today with the concessionaire  <strong>Zena Project</strong> , a project company created by the temporary grouping of companies  <strong>Cmb-Mieci -Arcoservizi, </strong> and will make use of the Project Management Consulting service of  <strong>RINA – PROGER</strong> .</p>
<p>The president of the IRCCS Giannina Gaslini Edoardo Garrone, the general director Renato Botti and the head of the Technical Office and RUP of the project, Ezio Nicolàs Bruno Urbina, presented the construction plan of the &#8220;Cantiere Nuovo Gaslini&#8221;, consisting of the <strong>construction</strong> of  <strong>a new hospital pavilion, called Padiglione Zero, of a new technological hub</strong> , <strong> and in the renovation of 5 historic pavilions with the consequent functional reorganization of the entire polyclinic.</strong></p>
<p><em>“With today&#8217;s signature the first phase of the works for the &#8216;Nuovo Gaslini&#8217; begins, our pediatric hospital has a unique history, which began in the 1930s, but its structural part, divided into 20 pavilions, is not today more adequate to meet the needs of modern healthcare, which provides structures organized by intensity of care, based on common resources, from the operating block to the laboratories, to the high, medium and low intensity departments&#8221; explains the president of the Gaslini</em>  Institute  <strong>, </strong> <strong>Edoardo Garrone</strong> . <em>“The solution was to build a modern hospital pavilion from scratch in the center of the historic hospital, demolishing two pavilions and building a new one at the top of the hill, called  <strong>Padiglione Zero </strong> to indicate a new beginning. Combined with the current central pavilions, it will constitute the acute hospital area. The modernization of the hospital takes shape in record time: a technologically cutting-edge future characterized by sustainability is emerging, which allows us to preserve the moral, health, scientific and also historical landscape heritage of the Gaslini intact&#8221; concludes</em>  the  <strong>President Garrone.</strong></p>
<p><em>“ <strong>Today is a historic day not only for Gaslini, but also for Liguria</strong> . A new challenge begins which, respecting tradition, looks to the future and innovation of the Institute, an absolute point of reference for pediatric care, research and medicine at an international level for 85 years. My  <strong>thanks go to the entire Gaslini team, who, a few months after the award of the tender, managed to start the executive phase, once again</strong> demonstrating seriousness, competence and, naturally, great human motivation, an essential element. The common objective is that this hospital continues to guarantee children the best possible healthcare, in a cutting-edge structure and with new services also for families for an increasingly tailored care of small patients&#8221; commented</em>  the <strong>l president of the Liguria Region Giovanni Toti </strong> during the presentation.</p>
<p><em>“ <strong>Today the new Gaslini is officially born, extraordinary news and a great opportunity for growth for the whole city</strong> . A project that does not just represent a simple modernization of existing structures, but which will contribute to a futuristic and at the same time sustainable urban development in one of the most valuable areas of Genoa. The Gaslini has always been a source of great pride for our city, a center of excellence which from today will be even more at the forefront on an international level&#8221; </em> declared the  <strong>mayor of Genoa Marco Bucci</strong> .</p>
<p><em>“When we talk about Gaslini, no particular declinations are needed: this name includes all the preparation, the professionalism, the ability to take care of small patients both at a Ligurian and national level. As a historic institute, the hospital has come to terms with its structural limitations and, with the advancement of new technologies and innovations in medicine, a change in the building part has therefore become necessary. The start of work on the construction of a new pavilion represents the acceleration necessary to offer, within a reasonable time, an institute that is in step with the times. Gaslini is thus preparing to face the new challenges in pediatric medicine with a new structure but also with a new training center recently inaugurated in Villa Quartara: thus closing the circle of an expertise that can be further consolidated at a national level and beyond ” </em> commented  <strong>the Liguria Region Health Councilor, Angelo Gratarola</strong> .</p>
<p><strong>The public-private partnership at the service of the Public Administration</strong></p>
<p>The  <strong>general director of the Gaslini Institute, Renato Botti</strong>  explained:  <em>“the Nuovo Gaslini comes to life thanks to a  <strong>complex project of technological, organizational and functional innovation</strong> , which was possible thanks to the  <strong>public-private partnership</strong> . A European public tender was called and  <strong>in 18 months Gaslini went from the idea to the awarding of the works and now the executive phase is starting</strong> . Padiglione Zero, which represents the first phase and the heart of the intervention, will be completed in compliance with the milestones envisaged by the PNRR (which finances a portion of the project worth 10 million euros out of a total operation of 180 million euros) ”.</em></p>
<p>&nbsp;</p>
<div class="wp-block-image"><img fetchpriority="high" decoding="async" class="alignnone wp-image-87879 size-large" src="https://www.gaslini.org/wp-content/uploads/2023/10/firma-concessione-1024x682.jpg" sizes="(max-width: 640px) 100vw, 640px" srcset="https://www.gaslini.org/wp-content/uploads/2023/10/firma-concessione-1024x682.jpg 1024w, https://www.gaslini.org/wp-content/uploads/2023/10/firma-concessione-300x200.jpg 300w, https://www.gaslini.org/wp-content/uploads/2023/10/firma-concessione-768x511.jpg 768w, https://www.gaslini.org/wp-content/uploads/2023/10/firma-concessione-471x314.jpg 471w, https://www.gaslini.org/wp-content/uploads/2023/10/firma-concessione-272x182.jpg 272w, https://www.gaslini.org/wp-content/uploads/2023/10/firma-concessione.jpg 1200w" alt="" width="640" height="426" /></div>
<p>The partnership, if well managed, should guarantee certain deadlines and requires a leap in quality from the public client. The private counterpart must also form a network of professionals capable of presenting themselves as the sole interlocutor of the Gaslini Institute. <strong>The entire operation from a real estate and structural point of view will be completed in six and a half years:</strong>  three years for the construction of Padiglione Zero, three and a half years for the renovation of the other pavilions. The partnership provides for the management of  <em>facility management</em> services , including energy supply, for 19 years from the construction of Padiglione Zero.</p>
<p><em>“In addition to the management of these services, the  <strong>private sector finances the operation with approximately 130 million</strong> . One of the advantages of the partnership consists in the possibility of starting without having to have the entire amount of the sums already in the budget, which is what you have to do with a normal contract. In this case the investment is around  <strong>180 million euros</strong>  and we &#8211; explains the  <strong>general director Renato Botti</strong>  &#8211; started with a capital, between public financial sources and sources from the Gaslini system (Gerolamo Gaslini Foundation and Giannina Gaslini Institute) which reaches 50 million. <strong>This is a courageous and open approach, which we are using in an innovative and effective way, demonstrating that even the Public Administration can carry out ambitious projects&#8221;.</strong></em></p>
<p><strong>Syriana Bertacchini, President of Zena Project and director of the project and services division for CMB</strong> , showed pride and emotion for the start of the construction sites: “ <em>Working on this work is an honor and a challenge. It is an honor, as promoting and constructing companies, to commit ourselves to this client and to what it represents in Italian public healthcare, to achieve the common objective of creating even more efficient structures and departments for the little ones. The challenge is to do it within a highly complex and structured reality, acting within a lively and busy environment, such as a hospital</em> .&#8221;</p>
<p><em> “We thank the  <strong>Gerolamo Gaslini Foundation</strong>  which allowed us to start the design process, allocating 20 million euros, the  <strong>Querci Foundation</strong> , which has actively supported the hospital for many years and we also thank all the private individuals who decide to contribute to the realization of the “Nuovo Gaslini”, through our new fundraising foundation  <strong>Gaslininsieme</strong> , as Pintus and Costa Crociere have just done, on the occasion of the 75th anniversary of the Italian company. We hope for further public funding from the State and the Region in the future – comments the  <strong>president of the Gaslini Institute, Edoardo Garrone</strong>  – Given the importance of this structural intervention, we need allocations that can guarantee sustainability, in order to find further resources even in capital account&#8221;.</em></p>
<p><strong>The four phases of the intervention</strong></p>
<p><strong>The intervention will be in 4 phases:</strong>  the first consists of the construction of  <strong><em>Padiglione Zero </em></strong> and will end in June 2026, the second in the renovation of the pads. 17, 18, and 6 and will end in June 2028, the third involves the renovation of the pad. 16th will end in August 2029, the fourth will carry out the renovation of the pad. 15 and will end in 2030.</p>
<p>Padiglione Zero will be created in three years and will centralize all emergency-urgent, high-intensity care and surgical functions for children, future mothers and families, guaranteeing maximum operational efficiency and excellent quality of care. In fact, the following will be located here: an emergency-urgency area functionally related to the hospital area of ​​diagnostic services; <strong>12 operating rooms</strong>  (of which 3 hybrid); <strong>8 labor/delivery rooms</strong>  (one of which is equipped for water births); <strong>70 beds in the</strong>  pediatric and neonatal intensive and sub-intensive care areas; <strong>130 beds in the hospital area for ordinary hospitalizations</strong>  (pediatric and maternal-child surgical). <strong>The total beds for the Genoa headquarters of Gaslini will be 493.</strong></p>
<p>The work will continue with a  <strong>second phase of renovation of Pavilions 6, 17 and 18, lasting approximately 18 months,</strong>  in order to improve the organizational efficiency of the Medical, Hemato-oncology, Neurosciences and Territorial Assistance Area, with the creation of new environments in which technology, research and clinical assistance integrate together, for the well-being of young patients.</p>
<p><strong>The third and fourth phases</strong> will also start in the following two years  : pavilion 15 will be completely dedicated to research, with the placement of all the laboratories  in a single building, while in pavilion. Low intensity activities (Rehabilitation and Community Hospital) will be located in 16.</p>
<p>Subsequently,  <strong>the complementary services of research, training, reception, company nursery and nursery, small sales areas and spaces for voluntary associations will be strengthened</strong> . The executive phase, which will therefore have a total duration of approximately six and a half years, also includes a  <strong>functional reorganization of the entire hospital grounds and its green areas</strong> , and will be based on a flexible, pleasant and safe architecture, designed following the main environmental sustainability protocols. <strong>At the end of the construction of Padiglione Zero , maintenance services</strong> will also start  , including the supply of energy carriers, with a concession with an effective duration of 22 years .</p>
<p><em>“ <strong>During all phases of the works, the normal development and functioning of all existing activities within the institute will be ensured</strong> ,  <strong>with respect for children, families and all staff</strong> . Controlled demolition will adopt all  safety <strong>precautions </strong> <strong>to minimize the spread of dust, noise and vibrations</strong> . Before the demolitions, the relocation of the functions will take place, some of which is already underway: the training center and the nursing school have already been relocated to Villa Quartara; the Rare Diseases Desk, the social workers area and the Children and Families Reception Center are being moved to Pavilion 13. The Institute&#8217;s operators are always updated on all movements through the Gaslini hospital intranet&#8221; explained</em>  the  <strong>responsible for Technical Services</strong> ,  <strong>Ezio Nicolàs Bruno Urbina</strong> .</p>
<p><strong>Traffic and parking</strong></p>
<p><strong>Traffic in the areas surrounding the hospital </strong> <strong>will not be changed until the end of December 2023</strong> . The first modification will take place starting from January 2024 when, in order to allow the transit of vehicles for the supply of construction site materials, the road system could be modified in via Redipuglia, but limited to the stretch that goes from Largo Francesco Cattanei to the entrance of the Hospital. Two alternatives are being evaluated with the Local Police and Technical Offices of the Municipality of Genoa: travel via Redipuglia in an alternate or two-way direction; the changes will be promptly communicated thanks to dedicated communication channels.</p>
<p>These changes to the road system may lead to the elimination of some  <strong>car parks</strong> , which may vary depending on the indications received from the Local Police. However,  <em>&#8220;to safeguard the number of parking spaces available today and avoid possible inconvenience to residents, hospital operators and users &#8211; reassured engineer  <strong>Bruno Urbina</strong>  &#8211; <strong> Gaslini has initiated the necessary discussions with Cassa Depositi e Prestiti and ARTE Genova </strong> <strong>for obtain</strong>  the  <strong>availability</strong> , within the property areas included in the former Quarto Hospital,  <strong>of </strong> <strong>parking spaces to compensate for the public ones which will be temporarily abolished</strong>  due to the works for the new hospital&#8221;.</em></p>
<p><strong>Stakeholder involvement and communication</strong></p>
<p>To meet the needs of users and citizens <strong>, Gaslini has </strong> <strong>started a process of involving stakeholders: </strong> institutions, schools, associations and inhabitants of neighboring neighborhoods, with the aim of informing users about the transformations underway, making use of the Avventura company Urban. The information will be disseminated through the website:  <a href="http://www.cantierenuovogaslini.org/"><strong>www.cantierenuovogaslini.org</strong> ,</a>  to update users on the progress of the works, the times, the construction phases, the methods of containment of potential impacts and the changes to the road system in the area .</p></div>
			</div>
			</div><div class="et_pb_with_border et_pb_column_1_4 et_pb_column et_pb_column_3  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_1  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>PRESS RELEASE</h3></div>
			</div><div class="et_pb_module et_pb_blog_0 et_pb_posts et_pb_bg_layout_light ">
				
				
				
				
				<div class="et_pb_ajax_pagination_container">
					
			<article id="post-1032" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_0_0 post-1032 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-1080x675.jpg" alt="Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-980x664.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/">Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero</a></h2>
				
					<p class="post-meta"><span class="published">23 Oct 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"><p>Firmato l’accordo di concessione delle aree per la costruzione: partono i cantieri di lavoro per la costruzione del Nuovo Gaslini.</p>
</div></div>			
			</article>
				
			<article id="post-1038" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_0_1 post-1038 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-1080x675.jpg" alt="The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-980x613.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-480x300.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/">The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi</a></h2>
				
					<p class="post-meta"><span class="published">10 Jul 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1062" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_0_2 post-1062 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg" alt="The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-480x476.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/">The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;</a></h2>
				
					<p class="post-meta"><span class="published">18 Apr 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1074" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_0_3 post-1074 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg" alt="The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-980x661.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-480x324.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/">The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros</a></h2>
				
					<p class="post-meta"><span class="published">8 Mar 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-911" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_0_4 post-911 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/nuovo-gasl-slide-1.png" alt="The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/">The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure</a></h2>
				
					<p class="post-meta"><span class="published">15 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-929" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_0_5 post-929 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-1080x675.jpg" alt="Gaslini has chosen the Public Interest Proposal for the New Hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-980x680.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-480x333.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/">Gaslini has chosen the Public Interest Proposal for the New Hospital</a></h2>
				
					<p class="post-meta"><span class="published">14 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-941" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_0_6 post-941 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/DSC_8430-1080x675.jpg" alt="Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/">Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)</a></h2>
				
					<p class="post-meta"><span class="published">18 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-973" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_0_7 post-973 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Renato-Botti-Direttore-Generale-Istituto-Giannina-Gaslini-1080x675.jpg" alt="The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/">The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million</a></h2>
				
					<p class="post-meta"><span class="published">2 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1026" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_0_8 post-1026 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg" alt="The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/">The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital</a></h2>
				
					<p class="post-meta"><span class="published">20 Jul 2021</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				<div><div class="pagination clearfix">
	<div class="alignleft"></div>
	<div class="alignright"></div>
</div></div></div>
				</div>
				 
			</div>
				
				
				
				
			</div>
				
				
			</div>
<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/">Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi</title>
		<link>https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 10 Jul 2023 22:23:16 +0000</pubDate>
				<category><![CDATA[comunicato stampa]]></category>
		<guid isPermaLink="false">https://www.cantierenuovogaslini.org/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/</guid>

					<description><![CDATA[<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/">The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_1 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_2">
				<div class="et_pb_column et_pb_column_1_2 et_pb_column_4  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_2 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					
				</div>
				
			</div>
			</div><div class="et_pb_column et_pb_column_1_2 et_pb_column_5  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_3 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					<h1 class="entry-title">The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi</h1>
				</div>
				
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_3">
				<div class="et_pb_column et_pb_column_3_4 et_pb_column_6  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_2  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong><span>The duration of the Concession will be 22 years and the estimated value of the Concession net of VAT for the envisaged period will be €541.94 million.</span></strong></p>
<p><span>Genoa, 10.07.2023. This morning the Board of Directors of the Giannina Gaslini Institute, chaired by President Edoardo Garrone, resolved to award the tender for the awarding of the concession for the modernization of the structure to the RTI (Temporary Business Grouping) CMB/MIECI/ARCOSERVIZI of the IRCCS G. Gaslini, consisting of the construction, from scratch, of a hospital pavilion, the extraordinary maintenance/refunctionalisation of other pavilions dedicated to healthcare activities and complementary services in the grounds of the Genoese hospital and the management of hard facility management services , including the supply of energy carriers. The procedure took place with the application of the criterion of the most economically advantageous offer, which was identified on the basis of the best quality-price ratio.</span></p>
<p><span>“Today is an important day: just two years after the presentation of the five-year Strategic Plan (May 2021) we have been awarded the tender to the RTI which will create the new Pavilion Zero, the renovation and modernization of our pediatric scientific polyclinic – explains the  </span><strong><span>president of the IRCCS Giannina Gaslini Institute, Edoardo Garrone</span></strong><span> -. In a very short time, our excellent team of professionals, under the guidance of the general director, managed to go through all the planning, organizational and participation steps which saw the involvement of the entire Gaslini community, the bodies and institutions involved. All this allows us to  </span><strong><span>open the construction site, with the preparatory works for demolition, by the end of August</span></strong><span> , a process that will end with the delivery of the &#8220;Zero Pavilion&#8221;, which must be finished by June 2026&#8243;.</span></p>
<p><span>“Today,  </span><strong><span>Gaslini can look to the future with confidence</span></strong><span> , knowing that the path has been paved to continue to be one of the major pediatric centers of reference at an international level. It is important to underline how  </span><strong><span>the chosen procedure &#8211; public-private partnership &#8211; should allow the deadlines set for the completion of the works to be respected</span></strong><span>  : in fact, only upon delivery of the properties will the private operator begin to collect his fee. We thank all the institutions involved, which have always supported us, for their attention and support, with full respect for their roles, with particular appreciation for the Liguria Region, the Municipality of Genoa, the Superintendence, the University of Genoa and ASL3 Genovese&#8221; concludes the president Garrone.</span></p>
<p><span>“With today&#8217;s milestone – comments the  </span><strong><span>president of the Liguria Region Giovanni Toti</span></strong><span>  – the “Nuovo Gaslini” project takes definitive and concrete shape, and begins its journey towards innovation, managing to preserve tradition. The start of the construction site in the next few weeks represents an excellent prospect: the Gaslini, an absolute point of reference for pediatric care, research and medicine at an international level for 85 years, continues to grow and looks to the future with an ambitious project that includes, among other things, the construction of a new pavilion in the center of the hospital, without interrupting any activity during the works. In this way it will be possible to offer new services to families, allow even more tailored care of young patients, capable of giving increasingly more adequate responses </span><strong><span>. My thanks go to the top management of the Institute and to the entire team of Gaslini professionals who achieved this result in just two years by involving the entire hospital in the most important design choices for the best efficiency of services</span></strong><span> . The Gaslini is a flagship, a source of pride and pride for our region: today it is even more so.&#8221;</span></p>
<p><span>“Our task is to guarantee healthcare services at the best possible level to all children who need them &#8211; explains the  </span><strong><span>general director of the Gaslini hospital, </span></strong> <strong><span>Renato Botti -. </span></strong><span>In a fascinating structural context of the 1930s, which wants to  </span><strong><span>preserve its history made up of pioneering women and men in many areas of paediatrics</span></strong><span> , continuing to provide excellent care, it was  </span><strong><span>necessary to devise a structural and organizational context that would provide more spaces functional to modern medicine</span></strong><span> , safeguarding service models built specifically for the child and his family, with new paths for the development of research and training. </span><strong> </strong><span>Among the most relevant innovations we find the </span><strong><span> reduction of clinical risk</span></strong><span> , which will be achieved by aiming for maximum efficiency and effectiveness in the management of healthcare activities, also through the centralization of hospital activities in the &#8220;Zero Pavilion&#8221; and in the surrounding buildings, all organized by intensity of treatments and providing a clear separation of paths between patients and operators. The contribution to internal reorganization is also fundamental, through the high flexibility and adaptability of the structures to the different management needs in line with the evolution of healthcare&#8221;.</span></p>
<p><span> “The Pavilion Zero project was developed from the early planning stages, with the use of digital modeling methodologies for infrastructures (BIM), and was oriented towards  </span><strong><span>green building</span></strong><span> : a biophilic building that systematizes passive solutions (shape of the building, thermal performance of the building envelope, solar shading, etc.), to minimize energy needs and allow it to be covered mainly with renewable and highly efficient sources&#8221; comments Ezio Nicolas Bruno  </span><strong><span>Urbina</span></strong><span> ,  </span><strong><span>head of the Technical Services of the Gaslini Hospital and RUP</span></strong><span>  (Sole Procedure Manager) of the “Nuovo Gaslini” project.</span></p>
<p><span>“The design envisaged </span><strong><span>completely new accessibility and usability, starting from the redefinition of the routes</span></strong><span>  and a layout that takes into consideration the uniqueness of each user. We also want to increase attractiveness and competitive capacity, thanks to the integration and strengthening of support and reception services, to improve the experience of families and operators, opening the Institute&#8217;s offer to a wider pool of users . We are working with various institutions,  </span><em><span>first and foremost </span></em><span> with the Municipality, Regione Arte and Cassa Depositi e Prestiti to address the complex issue of parking and traffic with the aim of minimizing inconvenience for patients, operators and residents&#8221; concludes the engineer Bruno Urbina.</span></p>
<p><span>The construction  </span><strong><span> of a new pavilion (Pavilion Zero) and the renovation of the existing pavilions have a total financial value of approximately 180.7 million euros of which 50.3 million, equal to 27.8% of the overall cost, to</span></strong><span> date they were obtained through public funding without obligation to repay. This includes the  </span><strong><span>20 million euros already approved by the Gerolamo Gaslini Foundation</span></strong><span> , to which are added  </span><strong><span>8.4 million PNRR-PNC, 6.5 million</span></strong><span>  pursuant to law 67/88,  </span><strong><span>1.8 million assigned by the Liguria Region</span></strong><span>  following the publication of the public notice and the rest comes from disposals of the Institute&#8217;s real estate assets and other state funding.</span></p>
<p><span>The remaining portion of expenses, equal to  </span><strong><span>130.4 million euros, is covered by private financing</span></strong><span> , the remuneration of which will be with a concession fee which will commit the Institute for 19 years. The  </span><strong><span>duration of the Concession will be 22 years</span></strong><span>  and the  </span><strong><span>estimated value of the Concession net of VAT for the envisaged period will be €541.94 million.</span></strong></p>
<p><span>The polyclinic that will arise from the complex transformation underway will be a city of health, capable of  </span><strong><span>further improving the effectiveness and safety of care for young patients</span></strong><span>  and the work and training experience for the entire community of operators, students, families, associations that experience the hospital every day. The new Gaslini responds to the needs of a modern integrated hub with high technological intensity, based on an  </span><strong><span>organizational model for care platforms</span></strong><span>  and homogeneous departmental work and study areas, organized according to the principle of intensity of care and technological complexity. </span><strong><span>A job that interprets and collects the indications of the health workers who work there and the families who frequent it. </span></strong><strong><span>Greater efficiency in the management of healthcare activities</span></strong><span>  will be achieved  , thanks to a single integrated hub (Pavilion Zero,  </span><a href="callto:15, 16, 17, 18"><span>15, 16, 17, 18</span></a><span> ) which overcomes the current fragmentation of healthcare services in multiple buildings. The functional organization is based on the separation of paths, with the dual objective of improving efficiency in the use of healthcare personnel and in the provision of services to the patient.</span></p>
<p><span>A hospital which will thus have the possibility, in the second phase of the intervention, to open up to students with a  </span><strong><span>University Campus</span></strong><span> , and to the neighborhood with a  </span><strong><span>company kindergarten</span></strong><span>  and  </span><strong><span>sports spaces,</span></strong><span>  through the  </span><strong><span>redevelopment of spaces inside the hospital citadel and the subsequent construction of a guesthouse for families and students</span></strong><span> .</span></p>
<p>&nbsp;</p>
<p><strong><span>Video commentary by Doctor Renato Botti, general director of the Gaslini Hospital</span></strong></p>
<div class="wp-video"><span class="mejs-offscreen"><span>Video Player</span></span></p>
<div id="mep_0" class="mejs-container mejs-container-keyboard-inactive wp-video-shortcode mejs-video" tabindex="0" role="application" aria-label="Video Player">
<div class="mejs-inner">
<div class="mejs-mediaelement"><video id="video-87538-1_html5" class="wp-video-shortcode" src="https://www.gaslini.org/wp-content/uploads/2023/07/Video-con-coperture-def.mp4?_=1" preload="metadata" width="640" height="360" data-mce-fragment="1"></video></div>
</div>
<div class="mejs-overlay mejs-layer mejs-overlay-play"> </div>
</div>
</div></div>
			</div>
			</div><div class="et_pb_with_border et_pb_column_1_4 et_pb_column et_pb_column_7  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_3  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>PRESS RELEASE</h3></div>
			</div><div class="et_pb_module et_pb_blog_1 et_pb_posts et_pb_bg_layout_light ">
				
				
				
				
				<div class="et_pb_ajax_pagination_container">
					
			<article id="post-1032" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_1_0 post-1032 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-1080x675.jpg" alt="Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-980x664.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/">Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero</a></h2>
				
					<p class="post-meta"><span class="published">23 Oct 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"><p>Firmato l’accordo di concessione delle aree per la costruzione: partono i cantieri di lavoro per la costruzione del Nuovo Gaslini.</p>
</div></div>			
			</article>
				
			<article id="post-1038" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_1_1 post-1038 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-1080x675.jpg" alt="The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-980x613.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-480x300.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/">The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi</a></h2>
				
					<p class="post-meta"><span class="published">10 Jul 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1062" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_1_2 post-1062 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg" alt="The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-480x476.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/">The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;</a></h2>
				
					<p class="post-meta"><span class="published">18 Apr 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1074" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_1_3 post-1074 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg" alt="The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-980x661.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-480x324.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/">The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros</a></h2>
				
					<p class="post-meta"><span class="published">8 Mar 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-911" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_1_4 post-911 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/nuovo-gasl-slide-1.png" alt="The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/">The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure</a></h2>
				
					<p class="post-meta"><span class="published">15 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-929" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_1_5 post-929 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-1080x675.jpg" alt="Gaslini has chosen the Public Interest Proposal for the New Hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-980x680.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-480x333.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/">Gaslini has chosen the Public Interest Proposal for the New Hospital</a></h2>
				
					<p class="post-meta"><span class="published">14 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-941" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_1_6 post-941 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/DSC_8430-1080x675.jpg" alt="Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/">Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)</a></h2>
				
					<p class="post-meta"><span class="published">18 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-973" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_1_7 post-973 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Renato-Botti-Direttore-Generale-Istituto-Giannina-Gaslini-1080x675.jpg" alt="The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/">The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million</a></h2>
				
					<p class="post-meta"><span class="published">2 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1026" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_1_8 post-1026 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg" alt="The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/">The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital</a></h2>
				
					<p class="post-meta"><span class="published">20 Jul 2021</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				<div><div class="pagination clearfix">
	<div class="alignleft"></div>
	<div class="alignright"></div>
</div></div></div>
				</div>
				 
			</div>
				
				
				
				
			</div>
				
				
			</div>
<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/">The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;</title>
		<link>https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 18 Apr 2023 22:28:43 +0000</pubDate>
				<category><![CDATA[comunicato stampa]]></category>
		<guid isPermaLink="false">https://www.cantierenuovogaslini.org/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/</guid>

					<description><![CDATA[<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/">The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_2 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_4">
				<div class="et_pb_column et_pb_column_1_2 et_pb_column_8  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_4 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					
				</div>
				
			</div>
			</div><div class="et_pb_column et_pb_column_1_2 et_pb_column_9  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_5 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					<h1 class="entry-title">The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;</h1>
				</div>
				
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_5">
				<div class="et_pb_column et_pb_column_3_4 et_pb_column_10  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_4  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3><b><span>Interested economic operators will have 45 days to submit offers starting from the date of publication in the Official Journal of the European Union and the Promoter will enjoy the right of pre-emption. </span></b></h3>
<h3><b><span><span class="">The duration of the Concession will be 22 years and the estimated value of the Concession net of VAT for the envisaged period will be €543.35 million.</span></span></b></h3>
<p><i><span>enova, 04.17.2023. </span></i><span> This afternoon the Board of Directors of the Giannina Gaslini Institute, chaired by President Edoardo Garrone, decided to launch the tender procedure entitled: &#8220;Open procedure relating to the awarding of the concession for the modernization of the IRCCS Gaslini hospital structure, located in Genoa , in via Gerolamo Gaslini n. <span class="">5, consisting in the construction, from scratch, of a hospital pavilion, the extraordinary maintenance/refunctionalisation of other pavilions dedicated to healthcare activities and complementary services in the hospital grounds and the management of hard facility management services, including the supply of energy carriers ”.</span></span></p>
<p><span>The procedure provides that the tender will be awarded by  </span><b><span>applying the criterion of the most economically advantageous offer</span></b><span> , which will be identified on the basis of the best quality-price ratio. Interested economic operators will have  </span><b><span>45 days to submit offers</span></b><span>  starting from the date of publication in the Official Journal of the European Union (scheduled for  </span><span id="OBJ_PREFIX_DWT3128_com_zimbra_date" class="Object"><span id="OBJ_PREFIX_DWT3141_com_zimbra_date" class="Object"><span id="OBJ_PREFIX_DWT3155_com_zimbra_date" class="Object" role="link"><span id="OBJ_PREFIX_DWT3166_com_zimbra_date" class="Object" role="link"><span>20 April 2023</span></span></span></span></span><span> ) and the Promoter will enjoy the right of first refusal.</span></p>
<p><i><span>“Calling the tender procedure in such a short time fills us with pride – comments the president </span><b><span>of the Gaslini Hospital, </span></b> <b><span>Edoardo Garrone &#8211;</span></b><span> . On behalf of myself and the entire Gaslini Board of Directors, I want to thank the excellent team of professionals &#8211; starting from the general director Renato Botti &#8211; who, working day and night with great competence, dedication and courage, have led us to this necessary and fundamental result to guarantee the future of the pediatric hospital and with it the best care for all the children in the world who need it.&#8221;</span></i></p>
<p><span>“We thank all the institutions involved, which have always supported us, for their attention and support, with full respect for their roles, with particular appreciation for the Liguria Region, the Municipality of Genoa, the Superintendency, the University of Genoa and Asl3 Genovese” explains the  </span><b><span>general director of the G. Gaslini Institute, Renato Botti.</span></b></p>
<p><b><span>“</span></b><span> The construction  </span><b><span>of a new pavilion (pavilion zero) and the renovation of the existing pavilions have a total financial value of approximately 178.5 million euros of which 50.3 million, equal to 28% of the overall cost,</span></b><span> to  </span><span id="OBJ_PREFIX_DWT3129_com_zimbra_date" class="Object"><span id="OBJ_PREFIX_DWT3142_com_zimbra_date" class="Object"><span id="OBJ_PREFIX_DWT3156_com_zimbra_date" class="Object" role="link"><span id="OBJ_PREFIX_DWT3167_com_zimbra_date" class="Object" role="link"><span>date</span></span></span></span></span><span>  they were obtained through public funding without obligation to repay &#8211; continues Botti -. This includes the  </span><b><span>20 million euros already approved by the Gerolamo Gaslini Foundation</span></b><span> , to which are added the  </span><b><span>8.4 million from PNRR-PNC, the 6.5 million</span></b><span>  pursuant to law 67/88, the  </span><b><span>1.8 million</span></b><span>  subsequently assigned by the Liguria Region upon publication of the public notice and the rest comes from sales of the Institute&#8217;s real estate assets and other state funding. The remaining portion of expenses, equal to  </span><b><span>128.2 million euros, is covered by private financing</span></b><span> , the remuneration of which will be with a concession fee which will commit the Institute for 19 years. The  </span><b><span>duration of the Concession will be 22 years</span></b><span>  and the  </span><b><span>estimated value of the Concession net of VAT for the envisaged period will be €543.35 million&#8221;.</span></b></p>
<p><b><span>The path that led to the “Nuovo Gaslini”</span></b></p>
<p><span>Following the public notice, resolved by the Board of Directors of the Gaslini Institute on  </span><span id="OBJ_PREFIX_DWT3130_com_zimbra_date" class="Object"><span id="OBJ_PREFIX_DWT3143_com_zimbra_date" class="Object"><span id="OBJ_PREFIX_DWT3157_com_zimbra_date" class="Object" role="link"><span id="OBJ_PREFIX_DWT3168_com_zimbra_date" class="Object" role="link"><span>21 February 2022</span></span></span></span></span><span> , and the three proposals received on 31  </span><span id="OBJ_PREFIX_DWT3131_com_zimbra_date" class="Object"><span>August </span></span><span> of the same year, at the end of the comparative procedure, it was identified as preferable by the Board of Directors of the Institute the offer of the temporary business group led by  </span><b><span>CMB &#8211; Cooperativa Muratori e Braccianti di Carpi &#8211; which will form the basis of the tender</span></b><span> .</span></p>
<p><b><span>The operation carried out</span></b><span>  by the Giannina Gaslini Institute which is configured as  </span><b><span>a Public Private Partnership with a public initiative </span></b><span> (PPP), was identified as a contractual solution capable not only of integrating public resources, but also of reducing critical risks such as higher costs, greater construction times, as well as interference between construction site and clinical continuity.</span></p>
<p><span>The  </span><b><span>Gerolamo Gaslini Foundation</span></b><span> , chaired by  </span><b><span>Mons. Marco Tasca</span></b><span> , bishop of Genoa, has guaranteed maximum support with two subsequent loans of a total of  </span><b><span>20 million euros in capital account, </span></b><span> in  </span><b><span>order to increase the percentage of non-repayable financing</span></b><span> ,  </span><b><span>and thus decrease the burden of the concession fee</span></b><span>   that the Giannina Gaslini Institute will have to pay starting from the delivery of the &#8220;Zero Pavilion&#8221;, expected by <span id="OBJ_PREFIX_DWT3132_com_zimbra_date" class="Object"><span id="OBJ_PREFIX_DWT3144_com_zimbra_date" class="Object">June </span></span><span id="OBJ_PREFIX_DWT3132_com_zimbra_date" class="Object"> 2026</span> .</span><span id="OBJ_PREFIX_DWT3132_com_zimbra_date" class="Object"> <span id="OBJ_PREFIX_DWT3144_com_zimbra_date" class="Object"></span></span></p>
<p><b> </b></p>
<p><img loading="lazy" decoding="async" class="alignright wp-image-87339 size-medium" src="https://www.gaslini.org/wp-content/uploads/2023/04/Cattura-1-300x215.jpg" sizes="auto, (max-width: 300px) 100vw, 300px" srcset="https://www.gaslini.org/wp-content/uploads/2023/04/Cattura-1-300x215.jpg 300w, https://www.gaslini.org/wp-content/uploads/2023/04/Cattura-1-768x550.jpg 768w, https://www.gaslini.org/wp-content/uploads/2023/04/Cattura-1-466x334.jpg 466w, https://www.gaslini.org/wp-content/uploads/2023/04/Cattura-1.jpg 1013w" alt="" width="300" height="215" /></p>
<p><b><span>The Gaslini of the future: a city of health</span></b></p>
<p><span>The polyclinic that will arise from the complex transformation underway is a city of health, capable of  </span><b><span>further improving the effectiveness and safety of care for young patients</span></b><span>  and the work and training experience for the entire community of operators, students, families, associations that experience the hospital every day. The new Gaslini responds to the needs of a modern integrated hub with high technological intensity, based on an  </span><b><span>organizational model for care platforms</span></b><span>  and homogeneous departmental work and study areas, organized according to the principle of intensity of care and technological complexity. A job that interprets and collects the indications of the health workers who work there and the families who frequent it. </span><b><span>Greater efficiency in the management of healthcare activities</span></b><span> will be achieved  , thanks to a single integrated hub (Hall ZERO,  </span><span id="OBJ_PREFIX_DWT3133_com_zimbra_phone" class="Object"><a href="https://www.gaslini.org/comunicati-stampa/listituto-giannina-gaslini-pubblica-il-bando-di-gara-per-la-costruzione-del-nuovo-gaslini/15,%2016,%2017,%2018" rel="noopener"><span>15, 16, 17, 18</span></a></span><span> ) which obviates the current fragmentation of healthcare services in multiple buildings.</span><br /><span>The functional organization is based on the separation of paths, with the dual objective of improving efficiency in the use of healthcare personnel and in the provision of services to the patient.</span></p>
<p><span>A hospital which will thus have the possibility, in the second phase of the intervention, to open up to students with a  </span><b><span>University Campus</span></b><span> , and to the neighborhood with a  </span><b><span>company kindergarten</span></b><span>  and  </span><b><span>sports spaces,</span></b><span>  through the  </span><b><span>redevelopment of spaces inside the hospital citadel and the subsequent construction of a guesthouse for families and students</span></b><span> . Gaslini has already defined the timing of the operation:  </span><b><span>construction site to begin by the summer of 2023 and “Padiglione Zero” ready by <span id="OBJ_PREFIX_DWT3134_com_zimbra_date" class="Object"><span id="OBJ_PREFIX_DWT3145_com_zimbra_date" class="Object">June </span></span><span id="OBJ_PREFIX_DWT3134_com_zimbra_date" class="Object"> 2026</span></span><span id="OBJ_PREFIX_DWT3134_com_zimbra_date" class="Object"> <span id="OBJ_PREFIX_DWT3145_com_zimbra_date" class="Object"></span></span></b><span> . From that date the successful tenderer will manage the services (energy and maintenance) for 19 years.</span></p>
<p>&nbsp;</p></div>
			</div>
			</div><div class="et_pb_with_border et_pb_column_1_4 et_pb_column et_pb_column_11  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_5  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>PRESS RELEASE</h3></div>
			</div><div class="et_pb_module et_pb_blog_2 et_pb_posts et_pb_bg_layout_light ">
				
				
				
				
				<div class="et_pb_ajax_pagination_container">
					
			<article id="post-1032" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_2_0 post-1032 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-1080x675.jpg" alt="Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-980x664.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/">Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero</a></h2>
				
					<p class="post-meta"><span class="published">23 Oct 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"><p>Firmato l’accordo di concessione delle aree per la costruzione: partono i cantieri di lavoro per la costruzione del Nuovo Gaslini.</p>
</div></div>			
			</article>
				
			<article id="post-1038" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_2_1 post-1038 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-1080x675.jpg" alt="The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-980x613.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-480x300.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/">The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi</a></h2>
				
					<p class="post-meta"><span class="published">10 Jul 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1062" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_2_2 post-1062 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg" alt="The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-480x476.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/">The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;</a></h2>
				
					<p class="post-meta"><span class="published">18 Apr 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1074" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_2_3 post-1074 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg" alt="The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-980x661.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-480x324.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/">The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros</a></h2>
				
					<p class="post-meta"><span class="published">8 Mar 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-911" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_2_4 post-911 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/nuovo-gasl-slide-1.png" alt="The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/">The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure</a></h2>
				
					<p class="post-meta"><span class="published">15 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-929" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_2_5 post-929 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-1080x675.jpg" alt="Gaslini has chosen the Public Interest Proposal for the New Hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-980x680.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-480x333.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/">Gaslini has chosen the Public Interest Proposal for the New Hospital</a></h2>
				
					<p class="post-meta"><span class="published">14 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-941" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_2_6 post-941 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/DSC_8430-1080x675.jpg" alt="Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/">Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)</a></h2>
				
					<p class="post-meta"><span class="published">18 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-973" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_2_7 post-973 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Renato-Botti-Direttore-Generale-Istituto-Giannina-Gaslini-1080x675.jpg" alt="The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/">The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million</a></h2>
				
					<p class="post-meta"><span class="published">2 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1026" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_2_8 post-1026 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg" alt="The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/">The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital</a></h2>
				
					<p class="post-meta"><span class="published">20 Jul 2021</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				<div><div class="pagination clearfix">
	<div class="alignleft"></div>
	<div class="alignright"></div>
</div></div></div>
				</div>
				 
			</div>
				
				
				
				
			</div>
				
				
			</div>
<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/">The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros</title>
		<link>https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 08 Mar 2023 07:32:17 +0000</pubDate>
				<category><![CDATA[comunicato stampa]]></category>
		<guid isPermaLink="false">https://www.cantierenuovogaslini.org/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/</guid>

					<description><![CDATA[<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/">The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_3 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_6">
				<div class="et_pb_column et_pb_column_1_2 et_pb_column_12  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_6 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					
				</div>
				
			</div>
			</div><div class="et_pb_column et_pb_column_1_2 et_pb_column_13  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_7 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					<h1 class="entry-title">The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros</h1>
				</div>
				
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_7">
				<div class="et_pb_column et_pb_column_3_4 et_pb_column_14  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_6  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><span>Genoa, 03.08.2023. The Board of Directors of the Gerolamo Gaslini Foundation was held this morning in the presence of the President Archbishop Mons. Marco Tasca and all the councilors.</span></p>
<p><span>In light of the forthcoming definition of the tender for the assignment of the works for the construction of the &#8220;Nuovo Gaslini&#8221;, the president Monsignor Marco Tasca has proposed the provision of a further loan of ten million euros in capital account </span><strong><span>, in order to increase the percentage of non-repayable public funding, thus decreasing the burden of the concession fee</span></strong><span> that will be borne by the Giannina Gaslini Institute starting from the delivery of the &#8220;Zero Pavilion&#8221; scheduled for June 2026.</span></p>
<p><span>“The contribution of the Gerolamo Gaslini Foundation is once again fundamental, as it always has been in the history of the Hospital, for the realization of this fundamental renovation work. We are grateful to our archbishop Monsignor Marco Tasca, President of the Gaslini Foundation and to the entire Council for the trust placed in us, which allows us to begin the work of transformation and relaunching the hospital in the necessary time&#8221; declared the President of the Institute Giannina Gaslini, </span><strong><span>Edoardo Garrone</span></strong><span> , on the sidelines of the Board of Directors of the Gaslini Foundation.</span></p>
<p><span>Following the public notice, resolved by the Board of Directors of the Gaslini Institute on 21 February 2022, and the three proposals received on 31 August of the same year, at the end of the comparative procedure, it was identified as preferable by the Board of Directors of the Institute the offer of the RTI (temporary business grouping) </span><strong><span>CMB</span></strong><span> , Cooperativa Muratori e Braccianti di Carpi, which will form the basis of the tender.</span></p>
<p><strong><span>The operation carried out by the Giannina Gaslini Institute which is configured as a Public Private Partnership with a public initiative</span></strong><span> (PPP), was identified as a contractual solution capable not only of integrating public resources, but also of reducing critical risks such as higher costs, greater construction times, as well as interference between construction site and clinical continuity.</span></p>
<p><span>“ </span><strong><span>The “Nuovo Gaslini” initiative has a total financial value of approximately 164.4 million euros of which 37 million</span></strong><span> , equal to 22% of the overall cost, </span><strong><span>to date have been raised through public funding without obligation to repay</span></strong><span> . This includes the 10 million euros already approved on 9 July 2021 by the Foundation itself, to which are added the 10 million PNRR, the 6.5 million pursuant to law 67/88, the 1.8 million assigned by the Liguria Region following the publication of the public notice and the rest comes from disposals of the Institute&#8217;s real estate assets. </span><strong><span>The remaining portion of costs, equal to 127.4 million euros, is covered by private financing</span></strong><span> , the remuneration of which will take place with a concession fee that </span><strong><span>will commit the Institute for 19 years</span></strong><span> ” explains the general director of the Giannina Gaslini hospital, </span><strong><span>Renato Botti</span></strong><span> .</span></p>
<p><span>“The intention of the Gerolamo Gaslini Foundation is to </span><strong><span>guarantee maximum support for the</span></strong><span> Institute&#8217;s innovation project by increasing the public contribution in the capital account, </span><strong><span>so that the Institute can be relieved of an important portion of the fee during the full management phase concessionaire</span></strong><span> ” explains </span><strong><span>Piergiorgio Alberti</span></strong><span> , Vice President of the Gerolamo Gaslini Foundation.</span></p>
<p><strong><span>THE NEW GASLINI</span></strong><br /><span>The polyclinic that will arise from the complex transformation underway is a city of health, capable of </span><strong><span>further improving the effectiveness and safety of care for young patients</span></strong><span> and the work and training experience for the entire community of operators, students , families, associations who experience the hospital every day. The new Gaslini responds to the needs of a modern integrated hub with high technological intensity, based on an </span><strong><span>organizational model for care platforms</span></strong><span> and homogeneous departmental work and study areas, organized according to the principle of intensity of care and technological complexity. A job that interprets and collects the indications of the health workers who work there and the families who frequent it. </span><strong><span>Greater efficiency in the management</span></strong><span> of healthcare activities will be achieved, thanks to a single integrated hub (Hall ZERO, 15, 16, 17, 18) which obviates the current fragmentation of healthcare services across multiple buildings .</span></p>
<p><span>The functional organization is based on the separation of paths, with the dual objective of improving efficiency in the use of healthcare personnel and in the provision of services to the patient. The new configuration will allow the adoption of an internal organization that is easily adaptable to different management needs and a dynamic healthcare service delivery logic, in line with the evolution of healthcare.</span></p>
<p><span>A hospital that will open to students with a </span><strong><span>University Campus</span></strong><span> , and to the neighborhood with a </span><strong><span>company nursery</span></strong><span> and sports spaces. Gaslini has already defined the timing of the operation: the construction site will begin by the summer of 2023 and the hospital will be ready by June 2026. Whoever wins the tender (by 31 May 2023) will secure the concession of services for 19 years, which will be the core business of investors. </span><strong><span>The tender involves the demolition of pavilions 7 and 8, the redevelopment of spaces inside the citadel and the subsequent construction of a guesthouse for families and students</span></strong><span> .</span></p>
<p><strong><span>THE GEROLAMO GASLINI FOUNDATION</span></strong><br /><span>The </span><strong><span>Gerolamo Gaslini Foundation was founded in 1949 at the behest of Senator Gerolamo Gaslini</span></strong><span> , already founder and financier in 1931 of the construction of the Giannina Gaslini pediatric hospital, inaugurated in 1938. The aim of the Foundation is to donate its income and, if necessary, , their assets, to the care, defense and assistance of infancy and childhood and in particular to the strengthening of the Giannina Gaslini Institute.</span></p>
<p><span>The following are part of the Board of Directors of the Gaslini Foundation: the Archbishop of Genoa, </span><strong><span>Mons. Marco Tasca</span></strong><span> as President; 3 members appointed by the President himself – Prof. Avv. </span><strong><span>Piergiorgio Alberti</span></strong><span> , Vice President, Dr. </span><strong><span>Lorenzo Ricci</span></strong><span> and Dr. </span><strong><span>Carla Sibilla</span></strong><span> ; the President of the Giannina Gaslini Institute, Dr. </span><strong><span>Edoardo Garrone</span></strong><span> ; the President of Confindustria Genoa, Dr. </span><strong><span>Umberto Risso</span></strong><span> ; the President of the Genoa Chamber of Commerce, Dr. </span><strong><span>Luigi Attanasio</span></strong><span> ; 1 member appointed by the First President of the Court of Appeal of Genoa, the lawyer </span><strong><span>Luigi Cocchi</span></strong><span> currently President of the Genoa Bar Association. Dr. </span><strong><span>Paolo D&#8217;Attilio</span></strong><span> President, Dr. </span><strong><span>Mario Bozza and Mario Pacciani</span></strong><span> are part of the Board of Auditors .</span></p>
<p><span>The headquarters of the Foundation is his home in the Villa Canali Gaslini in Corso Italia 26 which, in addition to hosting the offices, is now also used by the Gaslini Institute for events, courses and seminars. The Foundation&#8217;s assets are mainly made up of real estate properties in Genoa, Turin, Milan, Trieste and the Agricultural Society Fondi rustici Montelabate, in Umbria, including an ancient Abbey dating back to the year 1000. The majority of the assets derive from the management of the real estate assets. of the Foundation&#8217;s revenues (85%).</span></p></div>
			</div>
			</div><div class="et_pb_with_border et_pb_column_1_4 et_pb_column et_pb_column_15  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_7  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>PRESS RELEASE</h3></div>
			</div><div class="et_pb_module et_pb_blog_3 et_pb_posts et_pb_bg_layout_light ">
				
				
				
				
				<div class="et_pb_ajax_pagination_container">
					
			<article id="post-1032" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_3_0 post-1032 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-1080x675.jpg" alt="Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-980x664.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/">Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero</a></h2>
				
					<p class="post-meta"><span class="published">23 Oct 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"><p>Firmato l’accordo di concessione delle aree per la costruzione: partono i cantieri di lavoro per la costruzione del Nuovo Gaslini.</p>
</div></div>			
			</article>
				
			<article id="post-1038" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_3_1 post-1038 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-1080x675.jpg" alt="The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-980x613.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-480x300.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/">The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi</a></h2>
				
					<p class="post-meta"><span class="published">10 Jul 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1062" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_3_2 post-1062 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg" alt="The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-480x476.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/">The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;</a></h2>
				
					<p class="post-meta"><span class="published">18 Apr 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1074" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_3_3 post-1074 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg" alt="The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-980x661.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-480x324.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/">The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros</a></h2>
				
					<p class="post-meta"><span class="published">8 Mar 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-911" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_3_4 post-911 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/nuovo-gasl-slide-1.png" alt="The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/">The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure</a></h2>
				
					<p class="post-meta"><span class="published">15 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-929" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_3_5 post-929 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-1080x675.jpg" alt="Gaslini has chosen the Public Interest Proposal for the New Hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-980x680.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-480x333.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/">Gaslini has chosen the Public Interest Proposal for the New Hospital</a></h2>
				
					<p class="post-meta"><span class="published">14 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-941" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_3_6 post-941 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/DSC_8430-1080x675.jpg" alt="Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/">Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)</a></h2>
				
					<p class="post-meta"><span class="published">18 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-973" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_3_7 post-973 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Renato-Botti-Direttore-Generale-Istituto-Giannina-Gaslini-1080x675.jpg" alt="The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/">The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million</a></h2>
				
					<p class="post-meta"><span class="published">2 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1026" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_3_8 post-1026 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg" alt="The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/">The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital</a></h2>
				
					<p class="post-meta"><span class="published">20 Jul 2021</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				<div><div class="pagination clearfix">
	<div class="alignleft"></div>
	<div class="alignright"></div>
</div></div></div>
				</div>
				 
			</div>
				
				
				
				
			</div>
				
				
			</div>
<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/">The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure</title>
		<link>https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 15 Nov 2022 08:37:19 +0000</pubDate>
				<category><![CDATA[comunicato stampa]]></category>
		<guid isPermaLink="false">https://www.cantierenuovogaslini.org/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/</guid>

					<description><![CDATA[<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/">The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_4 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_8">
				<div class="et_pb_column et_pb_column_1_2 et_pb_column_16  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_8 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					
				</div>
				
			</div>
			</div><div class="et_pb_column et_pb_column_1_2 et_pb_column_17  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_9 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					<h1 class="entry-title">The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure</h1>
				</div>
				
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_9">
				<div class="et_pb_column et_pb_column_3_4 et_pb_column_18  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_8  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong>Genoa, 15 November 2022.</strong> The Board of Directors of the Gaslini Institute met yesterday evening in the presence of the president Edoardo Garrone, the vice-president Luciano Grasso, the councilors Luigi Carlo Bottaro, Andrea Del Grosso, Federico Delfino, Alberto Maestrini, Maurizio Mauri and Pietro Pongiglione and the President of the Board of Auditors Tommaso Lucia, decided on the choice of the Preferable proposal, among those identified as being of public interest. There were two proponents who reached the final comparative procedure: the RTI (temporary business grouping) with Percassi SpA, as agent, and the RTI with CMB (Cooperativa Muratori e Braccianti di Carpi) as agent.</p>
<p>At the end of the comparative procedure, the Board of Directors identified the <strong>RTI CMB</strong> proposal as the preferable one, among those identified as being of public interest.</p>
<p><iframe loading="lazy" src="https://www.facebook.com/plugins/video.php?height=314&amp;href=https%3A%2F%2Fwww.facebook.com%2Fistitutogaslini%2Fvideos%2F853654132344614%2F&amp;show_text=false&amp;width=560&amp;t=0" width="560" height="314" frameborder="0" scrolling="no" allowfullscreen="allowfullscreen" data-mce-fragment="1"></iframe></p>
<p>With this decision, the Board of Directors has chosen the project which, after possible further improvements, will become the basis of a European tender for the awarding of the concession for the modernization of the IRCCS Gaslini hospital structure, consisting in the construction from scratch, of a hospital pavilion, the extraordinary maintenance/refunctionalisation of other pavilions dedicated to healthcare activities and complementary services in the hospital grounds and the management of hard facility management services, including the supply of energy carriers.</p>
<p>This is a fundamental step in the renewal process that began with the implementation of the 2021-2025 Strategic Plan, presented on 1 June 2021, through which Gaslini decided to carry out a modernization intervention of its hospital structure, also involving the projects and financing from private entities, using the model of the concession contract to adequately qualified economic operators, which then occurred through the use of the instrument of the private initiative proposal (PPP), having considered this procedure the most effective and efficient to allow the modernization of the structure itself.</p>
<p>Very important for the realization of the entire process was the provision of a contribution of 10 million euros aimed at the design of the new building, approved on 10 July 2021 by the Board of Directors of the Gerolamo Gaslini Foundation, chaired by the Archbishop of Genoa, Mons <strong>. Marco Tasca</strong> .</p>
<p>A shared process: offering more and more to Gaslini patients thanks to the participation of those who work there</p>
<p>On 1 March 2022, the market consultation notice was published, aimed at soliciting the presentation of Proposals regarding the implementation of the modernization intervention of the Gaslini, with the creation, from scratch, of a hospital pavilion (so-called Pavilion Zero to distinguish it from the 20 already existing), the extraordinary maintenance/refunctionalisation of other pavilions dedicated to healthcare activities and complementary services in the hospital premises and the management of hard facility management services, including the supply of energy carriers. On March 18th there were 32 requests to participate and more than 100 technicians connected for the information day scheduled after the publication of the notice. On 1 April 2022, the Superintendency received a positive opinion regarding the possible reconstruction of buildings 7 and 8, the basis of the entire redevelopment project. From 31 August to 14 November the further steps of the process were completed: from the presentation of three proposals (RTI Percassi, RTI CMB, RTI Pizzarotti), to the establishment of a working group within the hospital, which involved over 60 Gaslini professionals, for a broad, shared and qualified evaluation of the proposals regarding the technical-planning, health aspects and economic-financial sustainability, in order to identify the feasible proposal that best responds to the Institute&#8217;s objectives, according to the traditional criteria of transparency and competence, up to the drafting of the final evaluation document of the two proposals of public interest, and yesterday, finally, to the choice made by the Hospital&#8217;s Board of Directors.</p>
<p>The next step, after a further phase of work with the chosen RTI to make further improvements to the project, will be the tendering of the Proposal for the assignment of the construction: in this competitive procedure the chosen RTI retains the right of first refusal. This model significantly reduces the implementation times of the intervention, which would otherwise be strongly influenced by the completion of multiple public procedures (in sequence) for the selection of designers and construction companies. From the moment the construction works are assigned, the construction of Pavilion Zero (the new monoblock) will take place in 38 months. In the event of delays both on Pavilion Zero and on the rest of the interventions, penalty mechanisms are envisaged precisely to incentivize the private sector upon completion of the work within the defined timeframes</p>
<p>A hospital that is and remains totally public managed, but created with the contribution of the capital and skills of private economic operators.</p>
<p><strong>A new hospital in its historic location: planning the future while safeguarding a past of excellence</strong></p>
<p>“The Gaslini Board of Directors has chosen the proposal that best responds to the Institute&#8217;s sustainable development needs, it has chosen to begin the process of modernizing the hospital, which will allow it to continue to improve its work at the service of children throughout the world. world. We are faced with a great challenge: to make the Gaslini a pediatric hospital for the future, but at the same time to preserve intact its moral, scientific health and also historical landscape heritage, in order to guarantee the development of the Institute, which has an enormous need for more functional and integrated spaces, without moving it to another location: this project will ensure a prestigious future for our IRCCS, without depriving it of its park connected to the beach on the sea of ​​Genoa, which Senator Gaslini chose as the best place of treatment for all children&#8221; explains the <strong>president of Gaslini, Edoardo Garrone</strong> .</p>
<p>“The polyclinic that is emerging from this complex transformation is a city of health, capable of further improving the effectiveness and safety of care for our young patients and the work and training experience for the entire community of operators, students, families, associations who experience the hospital every day. The new Gaslini responds to the needs of a modern integrated hub with high technological intensity, based on an organizational model for care platforms and homogeneous departmental work and study areas, organized according to the principle of intensity of care and technological complexity. A job that interprets and collects the indications of the health workers who work there and the families who frequent it. Greater efficiency in the management of healthcare activities will be achieved, thanks to a single integrated hub (Hall ZERO, 15, 16, 17, 18) which obviates the current fragmentation of healthcare services across multiple buildings. The functional organization is based on the separation of paths, with the dual objective of improving efficiency in the use of healthcare personnel and in the provision of services to the patient. The new configuration will allow us to adopt a resilient internal organisation, easily adaptable to different management needs and a dynamic healthcare service delivery logic, in line with the evolution of healthcare” explains the general director of Gaslini Renato <strong>Botti</strong> .</p>
<p>“The Nuovo Gaslini will be able to count on 346 beds, over half in single rooms, all with space for at least one companion and with a bathroom. The intensive care rooms will be single, in line with the most recent and efficient literature references. The entire gynecology and obstetrics department will also be completely renovated and relocated to give maximum comfort to future mothers. There will be additional comfort areas (healing gardens, rooms dedicated to refreshment and relaxation for parents, play areas for children &#8211; patients and non-patients, relaxation areas, rehabilitation rooms) for long-term patients and relatives. The IRCCS Gaslini has chosen the project closest to the wishes expressed in the notice to the economic operators: a large, complex team effort, carried out in a very short time by the hospital professionals, an extra-ordini design work, carried out simultaneously with the ordinary management of the Institute, for which I want to thank all the management, technical and healthcare, and the staff of the Gaslini&#8221; concludes the general director of the Gaslini Renato Botti.</p>
<p>“First of all I want to congratulate the entire management of the Gaslini Institute of Genoa for the speed with which we got here today, from the publication of the notice to the evaluation of all the proposals, carried out by a very large team of those who will have to actually work inside the new hospital, until the choice of the project which will be put to tender. The Genoese pediatric hospital, a point of reference for the care of the youngest patients at a national and international level, has demonstrated absolute excellence in this too – comments the <strong>president of the Liguria Region Giovanni Toti</strong> . The modernization of the Gaslini hospital structure, with the creation of a new pavilion and the regeneration of other spaces represents a further step forward for this reality, capable of meeting daily challenges and always remaining at the forefront, not only thanks to the quality and professionalism of the doctors, healthcare workers and researchers who work there, but also from a structural point of view. The Liguria Region has always supported Gaslini and will also do so for this important project, which will bring Genoa and Liguria even more to the center of pediatric medicine&#8221;.</p>
<p>“The new large monoblock and the refunctionalization of the other pavilions of the Gaslini institute are particularly important news for transforming this fundamental national and international healthcare reality also from a structural point of view &#8211; underlines the Liguria Region Health Councilor Angelo Gratarola &#8211; and <strong>achieving</strong> it towards new and strategic objectives. The new Gaslini in Quarto will undoubtedly represent a true city of pediatric health, involving not only healthcare personnel, but all the families of young patients and voluntary associations. The single rooms for intensive hospitalization and the new additional comfort areas clearly move in this direction. When you take care of a child you actually take care of an entire family, a role that Gaslini will play even more with the new project.&#8221;</p>
<p>“Thanks to this transformation, Gaslini will be able to improve the effectiveness and safety of care for young patients. The modernization will lead to the creation of a new, more functional, technologically advanced and sustainable pavilion, which will allow a remodulation of the entire healthcare offer, to continue to guarantee a very high quality service to the children of tomorrow. It is a great honor for the whole city to have such a cutting-edge center of excellence that all of Europe envies us. I am sure that this great challenge will be faced by all the hospital staff with pride and courage, elements that have always distinguished Gaslini. Good job everyone” declares <strong>mayor Marco Bucci</strong> .</p>
<p><strong>What the New Gaslini will be like</strong></p>
<p>The proposal for the Nuovo Gaslini presented by the Temporary Group of Companies made up of CMB Società Cooperativa Muratori e Braccianti di Carpi (leading company in the construction and management of the most modern hospital facilities), Mieci (Renovit group, the largest Italian energy efficiency company founded by the initiative of Snam and CDP Equity) and Arcoservizi (a company specialized in the heat management field), with the planning of the Mythos consortium (one of the main players in the sector of planning and construction management in the healthcare sector) will give rise to a profound functional reorganization of the the entire Institute, for an efficient, technologically advanced hospital, open to innovation and research and child-friendly.</p>
<p>The reorganization will be based on the construction of the new Pavilion Zero, the heart of the care-intensive functions: a flexible and welcoming architecture, a safe building conceived with the highest construction standards. A sustainable hospital, designed following the main environmental sustainability protocols, and strongly focused on the future. A monoblock that will integrate with the central pavilion (17-18) where there are now many departments and operating rooms.</p>
<p>Following the interventions relating to strictly healthcare functions, it will be possible to proceed with the strengthening of complementary services, for which at the moment only the project proposal has already been developed, in terms of: research and training (university campus with lecture hall/conference room), reception (guesthouse spaces for families on the move, researchers); company nursery and nursery, small sales areas for families and operators, spaces for voluntary associations, citizen&#8217;s help desk.</p>
<p><strong>The implementation phases</strong></p>
<p>The project is developed in four intervention phases, organized to guarantee the full functionality of the health areas, without interruptions to the services provided and without temporary transfers:</p>
<p>-the <strong>first phase</strong> sees the construction of the new ZERO Pavilion: the intervention will last 38 months and will allow the centralization of all emergency-urgency functions, with high care intensity and surgical activities for the child and mother, guaranteeing maximum operational efficiency and high quality of care. The construction of Pavilion Zero alone will increase the surface area allocated to high-intensity critical areas by 26%, allowing healthcare activities to be developed by up to 43% in the fourth year.</p>
<p>-the <strong>second phase</strong> , which will last 17 months, involves the renovation of Pavilions 6, 17 and 18, improving the reception and organizational efficiency of the Medical, Hemato-oncology, Neuroscience, Hospice and nursing areas.</p>
<p>After the first two phases, approximately 80% of the intervention will be completed: the Nuovo Gaslini will be able to carry out its activity in the new configuration optimized from a functional, health and management point of view.</p>
<p>-subsequently and progressively <strong>the third and fourth phases</strong> , lasting a total of 21 months, which include the renovation of Pavilions 16 and 15, where all the laboratories and departmental areas will be located.</p>
<p><strong>The advantages for the child and his family</strong></p>
<p>The new construction and the resulting global reorganization will allow:</p>
<p>– distinct and dedicated accesses and routes for: emergencies, users (with a route reserved for infectious diseases), healthcare personnel, logistics;</p>
<p>– contiguity of healthcare functions according to the functional links scheme;</p>
<p>– no areas intended for patients in underground spaces.</p>
<p>The introduction of &#8220;Single Family Rooms&#8221; for the right care of the newborn, with mum and dad</p>
<p>An inpatient area for the puerperium will be dedicated to obstetric-gynecological assistance with a totally new rooming-in in pavilion zero. The rooms will have one or a maximum of two beds, with attached bathroom. The delivery unit will be equipped with 6 labor rooms, 6 delivery rooms, 2 operating rooms and 4 neonatal islands in a dedicated area.</p>
<p><strong>Pavilion Zero</strong></p>
<p>The new building, consisting of 7 floors for a surface area of ​​30,000 square metres, will host once completed:</p>
<p>-the emergency-urgency area, functionally related to the hospital area of ​​diagnosis services;</p>
<p>-the operating block (12 rooms, 3 of which are hybrid) and the delivery block (8 labor and delivery rooms, one of which is equipped for water births);</p>
<p>-the intensive care areas: pediatric and neonatal intensive and sub-intensive care (72 beds);</p>
<p>-the hospital area for ordinary hospitalizations (pediatric and maternal-child surgical) for approximately 130 beds.</p>
<p>The building is completed by two underground floors, dedicated to services, logistics and parking, and by the roofing floor where the helipad is planned, for the take-off and landing of helicopters.</p>
<p>The operating group will be highly technological, unique and equipped with 10 operating rooms (plus 2 for childbirth) of which one dedicated to emergencies and 9 for &#8220;scheduled&#8221; activities.</p>
<p>The rooms dedicated to the laboratories include a functional area dedicated to assistance &#8211; with the Transfusion Service, the Pathological Anatomy, the Central Analysis Laboratory &#8211; and a functional area dedicated to research, adjacent to each other and extending up to approximately 6,000 m2. A completely renovated area will be dedicated to the imaging area.</p>
<p><strong>The management</strong></p>
<p>Management is expected to last 22 years and includes the management of plant and building maintenance services, the supply of energy carriers, with the aim of maximum energy efficiency and reduction of the use of fossil fuels, through the use of renewable sources and self-produced energy through the new cogeneration plant. The project was aimed at pursuing the eco-sustainability certification of LEED GOLD buildings.</p>
<p><strong>Investment and management costs</strong></p>
<p>The overall cost of the works and ancillary expenses, supported entirely by the concessionaire, is 145.6 million euros; at the time of the notice, the amount was estimated at 124 million, but the increase in the price of materials and energy in recent months has made a revaluation necessary. The total of the intervention &#8211; including financial charges and other capitalized costs borne by the concessionaire &#8211; is equal to 164.4 million euros.</p>
<p>The fee that the Institute will have to pay following the making available of the structures (starting from the 4th year) is made up of 3 components: 1) the fee for the availability of buildings and furnishings; 2) the fee for the so-called Facility Management (FM: management of ordinary and extraordinary maintenance); 3) the fee for the energy service.</p>
<p>When fully operational, the total fee will be 28.2 million per year made up of 16 million for availability, 3.4 million for FM, 8.8 million for energy services.</p>
<p><strong>The sources of financing</strong></p>
<p>The PEF of the initiative provides, against the 164.4 million euros of the overall value of the operation, a public financing of 35.2 million euros (10 million PNRR, 6.5 million ex law 67/88 , 10 million from the Gaslini Foundation and the rest from disposals of the Institute&#8217;s real estate assets) and a private loan of 129.2 million euros. The shares represent respectively 21.4% (public) and 78.6% (private) of the overall value of the intervention. Please note that the relevant legislation provides that public financing in PPP operations can reach a maximum of 49% of the overall value. <span class="VIpgJd-yAWNEb-VIpgJd-fmcmS-sn54Q">There is therefore room for additional public resources that could derive from further funding from the relevant bodies, given the feasibility of the project whose timing is compatible with the deadlines of the PNRR.</span></p></div>
			</div>
			</div><div class="et_pb_with_border et_pb_column_1_4 et_pb_column et_pb_column_19  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_9  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>COMUNICATI STAMPA</h3></div>
			</div><div class="et_pb_module et_pb_blog_4 et_pb_posts et_pb_bg_layout_light ">
				
				
				
				
				<div class="et_pb_ajax_pagination_container">
					
			<article id="post-1032" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_4_0 post-1032 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-1080x675.jpg" alt="Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-980x664.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/">Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero</a></h2>
				
					<p class="post-meta"><span class="published">23 Oct 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"><p>Firmato l’accordo di concessione delle aree per la costruzione: partono i cantieri di lavoro per la costruzione del Nuovo Gaslini.</p>
</div></div>			
			</article>
				
			<article id="post-1038" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_4_1 post-1038 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-1080x675.jpg" alt="The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-980x613.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-480x300.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/">The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi</a></h2>
				
					<p class="post-meta"><span class="published">10 Jul 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1062" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_4_2 post-1062 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg" alt="The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-480x476.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/">The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;</a></h2>
				
					<p class="post-meta"><span class="published">18 Apr 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1074" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_4_3 post-1074 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg" alt="The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-980x661.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-480x324.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/">The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros</a></h2>
				
					<p class="post-meta"><span class="published">8 Mar 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-911" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_4_4 post-911 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/nuovo-gasl-slide-1.png" alt="The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/">The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure</a></h2>
				
					<p class="post-meta"><span class="published">15 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-929" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_4_5 post-929 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-1080x675.jpg" alt="Gaslini has chosen the Public Interest Proposal for the New Hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-980x680.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-480x333.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/">Gaslini has chosen the Public Interest Proposal for the New Hospital</a></h2>
				
					<p class="post-meta"><span class="published">14 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-941" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_4_6 post-941 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/DSC_8430-1080x675.jpg" alt="Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/">Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)</a></h2>
				
					<p class="post-meta"><span class="published">18 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-973" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_4_7 post-973 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Renato-Botti-Direttore-Generale-Istituto-Giannina-Gaslini-1080x675.jpg" alt="The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/">The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million</a></h2>
				
					<p class="post-meta"><span class="published">2 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1026" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_4_8 post-1026 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg" alt="The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/">The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital</a></h2>
				
					<p class="post-meta"><span class="published">20 Jul 2021</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				<div><div class="pagination clearfix">
	<div class="alignleft"></div>
	<div class="alignright"></div>
</div></div></div>
				</div>
				 
			</div>
				
				
				
				
			</div>
				
				
			</div>
<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/">The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Gaslini has chosen the Public Interest Proposal for the New Hospital</title>
		<link>https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 14 Nov 2022 08:41:14 +0000</pubDate>
				<category><![CDATA[comunicato stampa]]></category>
		<guid isPermaLink="false">https://www.cantierenuovogaslini.org/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/</guid>

					<description><![CDATA[<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/">Gaslini has chosen the Public Interest Proposal for the New Hospital</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_5 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_10">
				<div class="et_pb_column et_pb_column_1_2 et_pb_column_20  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_10 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					
				</div>
				
			</div>
			</div><div class="et_pb_column et_pb_column_1_2 et_pb_column_21  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_11 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					<h1 class="entry-title">Gaslini has chosen the Public Interest Proposal for the New Hospital</h1>
				</div>
				
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_11">
				<div class="et_pb_column et_pb_column_3_4 et_pb_column_22  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_10  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><strong><span>Genoa, 14 November 2022.</span></strong><span> The Board of Directors of the Gaslini Institute, meeting today at the headquarters of the Genoese pediatric hospital, with the participation of the </span><strong><span>president Edoardo Garrone, the vice-president Luciano Grasso, the councilors Luigi Carlo Bottaro, Andrea Del Grosso, Federico Delfino, Alberto Maestrini, Maurizio Mauri and Pietro Pongiglione and the president of the Board of Statutory Auditors Tomaso Lucia</span></strong><span> , decided, on the proposal of the </span><strong><span>general director Renato Botti</span></strong><span> , the choice of the preferable Proposal, among those identified as being of public interest.</span><br /><span>The two proponents who reached the final comparative procedure were the RTI (Temporary Grouping of Companies) with the company Percassi SpA as agent and the RTI with CMB (Cooperativa Muratori e Braccianti di Carpi) as agent.</span></p>
<p><span>At the end of the comparative procedure, the Board of Directors identified the </span><strong><span>RTI CMB</span></strong><span> proposal as the preferable one, among those identified as being of public interest.</span><br /><span>With this decision, the Board of Directors has chosen the project which, after possible further improvements, will become the basis of a European tender for the awarding of the concession for the modernization of the IRCCS Gaslini hospital structure, consisting in the construction from scratch, of a hospital pavilion, the extraordinary maintenance/refunctionalisation of other pavilions dedicated to healthcare activities and complementary services in the hospital grounds and the management of hard facility management services, including the supply of energy carriers.</span></p>
<p><span>Tomorrow </span><strong><span>Tuesday 15 November, at 12.00</span></strong><span> , the relevant information regarding the chosen proposal will be provided during a press conference to be held in the Aula Magna of the Gaslini Institute (pavilion 16, ground floor): the president of the Institute </span><strong><span>Edoardo Garrone</span></strong><span> , the general director of the Institute </span><strong><span>Renato Botti</span></strong><span> and the RUP (Sole Procedure Manager) </span><strong><span>Ezio Nicolas Bruno Urbina</span></strong><span> will illustrate, together with the representative of the RTI CMB, the chosen proposal, how the Genoese pediatric hospital will change, the opportunities and needs resulting from the development of the global modernization and relaunch project of the Institute.</span></p>
<p><strong><span>The President of the Liguria Region Giovanni Toti, the Mayor of Genoa Marco Bucci and the Health Councilor Angelo Gratarola</span></strong><span> will take part in the meeting .</span></p></div>
			</div>
			</div><div class="et_pb_with_border et_pb_column_1_4 et_pb_column et_pb_column_23  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_11  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>PRESS RELEASE</h3></div>
			</div><div class="et_pb_module et_pb_blog_5 et_pb_posts et_pb_bg_layout_light ">
				
				
				
				
				<div class="et_pb_ajax_pagination_container">
					
			<article id="post-1032" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_5_0 post-1032 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-1080x675.jpg" alt="Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-980x664.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/">Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero</a></h2>
				
					<p class="post-meta"><span class="published">23 Oct 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"><p>Firmato l’accordo di concessione delle aree per la costruzione: partono i cantieri di lavoro per la costruzione del Nuovo Gaslini.</p>
</div></div>			
			</article>
				
			<article id="post-1038" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_5_1 post-1038 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-1080x675.jpg" alt="The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-980x613.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-480x300.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/">The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi</a></h2>
				
					<p class="post-meta"><span class="published">10 Jul 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1062" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_5_2 post-1062 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg" alt="The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-480x476.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/">The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;</a></h2>
				
					<p class="post-meta"><span class="published">18 Apr 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1074" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_5_3 post-1074 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg" alt="The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-980x661.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-480x324.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/">The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros</a></h2>
				
					<p class="post-meta"><span class="published">8 Mar 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-911" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_5_4 post-911 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/nuovo-gasl-slide-1.png" alt="The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/">The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure</a></h2>
				
					<p class="post-meta"><span class="published">15 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-929" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_5_5 post-929 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-1080x675.jpg" alt="Gaslini has chosen the Public Interest Proposal for the New Hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-980x680.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-480x333.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/">Gaslini has chosen the Public Interest Proposal for the New Hospital</a></h2>
				
					<p class="post-meta"><span class="published">14 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-941" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_5_6 post-941 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/DSC_8430-1080x675.jpg" alt="Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/">Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)</a></h2>
				
					<p class="post-meta"><span class="published">18 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-973" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_5_7 post-973 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Renato-Botti-Direttore-Generale-Istituto-Giannina-Gaslini-1080x675.jpg" alt="The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/">The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million</a></h2>
				
					<p class="post-meta"><span class="published">2 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1026" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_5_8 post-1026 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg" alt="The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/">The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital</a></h2>
				
					<p class="post-meta"><span class="published">20 Jul 2021</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				<div><div class="pagination clearfix">
	<div class="alignleft"></div>
	<div class="alignright"></div>
</div></div></div>
				</div>
				 
			</div>
				
				
				
				
			</div>
				
				
			</div>
<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/">Gaslini has chosen the Public Interest Proposal for the New Hospital</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)</title>
		<link>https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 18 Mar 2022 08:44:50 +0000</pubDate>
				<category><![CDATA[comunicato stampa]]></category>
		<guid isPermaLink="false">https://www.cantierenuovogaslini.org/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/</guid>

					<description><![CDATA[<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/">Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_6 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_12">
				<div class="et_pb_column et_pb_column_1_2 et_pb_column_24  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_12 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					
				</div>
				
			</div>
			</div><div class="et_pb_column et_pb_column_1_2 et_pb_column_25  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_13 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					<h1 class="entry-title">Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)</h1>
				</div>
				
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_13">
				<div class="et_pb_column et_pb_column_3_4 et_pb_column_26  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_12  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><span>Genoa. There were </span><strong><span>32 requests for participation and more than 100 technicians connected</span></strong><span> for the information day scheduled after the publication of the &#8220;solicitation of proposals in Public Private Partnership (PPP)&#8221; notice published on Tuesday 1 March 2022 by IRCCS Gaslini for the concession concerning the modernization of its hospital structure.</span></p>
<p><span>As per the 2021-2025 Strategic Plan, Gaslini has in fact decided to carry out </span><strong><span>a modernization intervention</span></strong><span> of its hospital structure, also involving the planning and financing capabilities of private entities, </span><strong><span>using the concession contract model for adequately qualified economic operators</span></strong><span> , which will take place through the use of the private initiative proposal (PPP) instrument, believing this procedure to be the most effective and efficient to allow the modernization of the structure itself.</span></p>
<p><span>“An important and qualified participation” – said </span><strong><span>Renato Botti, general director of the Giannina Gaslini Institute</span></strong><span> , who spoke together with the Institute&#8217;s Health and Scientific Directorates – “which gives us hope for the interest aroused by the proposal on the market. These are challenging projects also for companies, which raise the level of quality of participation in similar projects&#8221;.</span></p>
<p><span>“From March 16 – said the engineer. </span><strong><span>Nicolas Urbina, director of technical services of the pediatric hospital</span></strong><span> &#8211; &#8220;the interested consortia can request to make appointments for the necessary technical inspections&#8221;.</span></p>
<p><strong><span>The planned investment is 137 million of which approximately 35 are insured by the public share</span></strong><span> . The project aims at the </span><strong><span>construction of the so-called &#8220;Zero Pavilion&#8221;, and the refunctionalization of 5 buildings with social uses</span></strong><span> to support healthcare activities that contribute to creating added value and growth in competitiveness for the New Gaslini.</span></p>
<p><strong><span>New Gaslini Technical Data Sheet</span></strong></p>
<p><strong><span>A monoblock</span></strong><span> that will integrate with the central pavilion where there are now many departments and operating rooms. A hospital that </span><strong><span>will be open to students with a University Campus</span></strong><span> , and to the neighborhood with a </span><strong><span>company nursery</span></strong><span> , a </span><strong><span>guesthouse for both students and the families of young patients</span></strong><span> , small </span><strong><span>commercial spaces serving</span></strong><span> the population that revolves around the Gaslini, spaces for sports and motor rehabilitation also open to the city.</span></p>
<p><strong><span>It will be up to the hospital to choose the project and entrust the construction</span></strong><span> : this model considerably reduces times and above all disputes. The hospital will be transformed into </span><strong><span>a health city</span></strong><span> and improve its international attractiveness. In line with the new organizational models approved by the Board of Directors on 12/13/2021, it is intended to design and build a hospital by intensity of care (high intensity, medium intensity and low intensity) where the effectiveness and efficiency of clinical processes can be pursued through the creation of platforms common physical and organizational (hospital wards, clinical and research laboratories, outpatient activities, day and week surgery operating rooms, high technologies&#8230;).</span></p>
<p><span>“It is planned to create </span><strong><span>339 ordinary inpatient beds, 36 day hospitals and 14 day surgeries, as well as 66 technical beds</span></strong><span> (dialysis, nursery cots, etc.); all rooms will have one or two beds with toilet and bed for the companion. </span><strong><span>10 operating rooms</span></strong><span> are planned , including 1 for emergencies and 1 hybrid. Finally, it is planned to renew and strengthen the current technological park” explains the </span><strong><span>general director of Gaslini Renato Botti. </span></strong><span>A hospital that remains publicly managed but built with the participation of the private sector.</span></p>
<p><span>The Notice, published starting from 1 March 2022 on the institutional website of the Institute and, in extract, in the Official Journal of the European Union, in the Official Journal of the Italian Republic, can be viewed at the following link:</span></p>
<p><a href="https://amministrazionetrasparente.gaslini.org/servizi/bandi/bandi_fase02.aspx?ID=7598"><span>https:// amministrazionetrasparente.gaslini.org/servizi/bandi/bandi_fase02.aspx?ID=7598</span></a></p></div>
			</div>
			</div><div class="et_pb_with_border et_pb_column_1_4 et_pb_column et_pb_column_27  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_13  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>PRESS RELEASE</h3></div>
			</div><div class="et_pb_module et_pb_blog_6 et_pb_posts et_pb_bg_layout_light ">
				
				
				
				
				<div class="et_pb_ajax_pagination_container">
					
			<article id="post-1032" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_6_0 post-1032 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-1080x675.jpg" alt="Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-980x664.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/">Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero</a></h2>
				
					<p class="post-meta"><span class="published">23 Oct 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"><p>Firmato l’accordo di concessione delle aree per la costruzione: partono i cantieri di lavoro per la costruzione del Nuovo Gaslini.</p>
</div></div>			
			</article>
				
			<article id="post-1038" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_6_1 post-1038 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-1080x675.jpg" alt="The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-980x613.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-480x300.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/">The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi</a></h2>
				
					<p class="post-meta"><span class="published">10 Jul 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1062" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_6_2 post-1062 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg" alt="The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-480x476.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/">The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;</a></h2>
				
					<p class="post-meta"><span class="published">18 Apr 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1074" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_6_3 post-1074 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg" alt="The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-980x661.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-480x324.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/">The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros</a></h2>
				
					<p class="post-meta"><span class="published">8 Mar 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-911" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_6_4 post-911 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/nuovo-gasl-slide-1.png" alt="The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/">The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure</a></h2>
				
					<p class="post-meta"><span class="published">15 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-929" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_6_5 post-929 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-1080x675.jpg" alt="Gaslini has chosen the Public Interest Proposal for the New Hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-980x680.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-480x333.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/">Gaslini has chosen the Public Interest Proposal for the New Hospital</a></h2>
				
					<p class="post-meta"><span class="published">14 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-941" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_6_6 post-941 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/DSC_8430-1080x675.jpg" alt="Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/">Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)</a></h2>
				
					<p class="post-meta"><span class="published">18 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-973" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_6_7 post-973 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Renato-Botti-Direttore-Generale-Istituto-Giannina-Gaslini-1080x675.jpg" alt="The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/">The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million</a></h2>
				
					<p class="post-meta"><span class="published">2 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1026" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_6_8 post-1026 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg" alt="The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/">The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital</a></h2>
				
					<p class="post-meta"><span class="published">20 Jul 2021</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				<div><div class="pagination clearfix">
	<div class="alignleft"></div>
	<div class="alignright"></div>
</div></div></div>
				</div>
				 
			</div>
				
				
				
				
			</div>
				
				
			</div>
<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/">Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million</title>
		<link>https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 02 Mar 2022 10:20:56 +0000</pubDate>
				<category><![CDATA[comunicato stampa]]></category>
		<guid isPermaLink="false">https://www.cantierenuovogaslini.org/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/</guid>

					<description><![CDATA[<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/">The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_7 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_14">
				<div class="et_pb_column et_pb_column_1_2 et_pb_column_28  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_14 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					
				</div>
				
			</div>
			</div><div class="et_pb_column et_pb_column_1_2 et_pb_column_29  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_15 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					<h1 class="entry-title">The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million</h1>
				</div>
				
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_15">
				<div class="et_pb_column et_pb_column_3_4 et_pb_column_30  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_14  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><div id="panel-86037-0-0-0" class="so-panel widget widget_sow-editor panel-first-child" data-index="0">
<div class="so-widget-sow-editor so-widget-sow-editor-base">
<div class="siteorigin-widget-tinymce textwidget">
<p><span><span class="VIpgJd-yAWNEb-VIpgJd-fmcmS-sn54Q">Genoa. </span><strong>With an expected value of 137 million, the market consultation notice</strong> was </span><strong><span>published today</span></strong><span> , 1 March 2022, by the G. Gaslini Institute in the Official Journal of the European Union , aimed at soliciting the presentation of Proposals concerning the realization </span><strong><span>of the modernization of its hospital structure</span></strong><span> , with the creation, from scratch, of a hospital pavilion, the extraordinary maintenance/refunctionalisation of other pavilions dedicated to healthcare activities and complementary services in the hospital premises and the management of </span><em><span>hard facility services management</span></em><span> , including the supply of energy carriers.</span></p>
<p><span>As per the 2021-2025 Strategic Plan, Gaslini has decided to carry out a </span><strong><span>modernization intervention of its hospital structure, also involving the planning and financing capabilities of private entities</span></strong><span> , using the model of the concession contract to adequately qualified economic operators, which will take place </span><strong><span>through the use of the private initiative proposal (PPP) instrument</span></strong><span> , considering this procedure the most effective and efficient to allow the modernization of the structure itself.</span></p>
<p><span>The Gaslini Board of Directors decided to order the publication of the Notice starting from 1 March 2022 on the institutional website of the Institute for the entire period within which it is possible to submit the Proposals and, in extract, in the Official Journal of the European Union , in the Official Gazette of the Italian Republic and in 3 national newspapers, to allow for better dissemination: </span><a href="https://amministrazionetrasparente.gaslini.org/servizi/bandi/bandi_fase02.aspx?ID=7598"><span>https:// amministrazionetrasparente.gaslini.org/servizi/bandi/bandi_fase02.aspx?ID=7598</span></a></p>
<p><span>“With the new Strategic Plan, the Gaslini hospital, which already represents a flagship of our Region and of Italian pediatric healthcare, is ready to confirm its excellence in the care of the littlest ones on a global level – explained the president </span><strong><span>of Liguria Region and Health Councilor Giovanni Toti</span></strong><span> -. An injection of energy for the future, with the ambitious project of a partial reconstruction of a group of buildings and with the demolition of pavilions 7 and 8 for the construction of a new building capable of offering new services to families, where the child will be increasingly at the center of planning, in a welcoming hospital but ready to provide increasingly adequate responses to the new needs of the little ones. After 83 years of excellence, commitment, innovation and scientific research, the new Strategic Plan will allow Gaslini to increasingly be the point of reference for Italian pediatrics and a source of pride for Liguria&#8221;.</span></p>
<p><span>“I am very satisfied with all the work carried out to date by the Gaslini Management together with the managers and technicians: </span><strong><span>great team work, with the entire Board of Directors compact and proactive, all motivated by the great responsibility of laying the foundations for the hospital pediatric of the future</span></strong><span> , without betraying the ancient but very current principles that have written its history. A modern, scientifically futuristic hospital, open to the city, students, families and associations, which will be as green as possible and oriented towards sustainable development&#8221; declared the president of the </span><strong><span>Giannina Gaslini Institute, Edoardo Garrone</span></strong><span> .</span></p>
<p><span>“A hospital which, as promised, does not abandon its historic and much-loved headquarters in Genova Quarto, with its large park overlooking the sea and its beach, but on the contrary enhances what already exists, creating new value, also from a urban planning. A renewal that is necessary to safeguard the heritage of skills, professionalism and humanity that have made our pediatric hospital unique on an international level. </span><strong><span>This is an important step, which starting from Gaslini will produce positive repercussions for the development and attractiveness of the entire city</span></strong><span> ” concluded President Garrone.</span></p>
<p><span>“It will be called &#8220;Zero Pavilion&#8221;, it will be built on the Quarto hill, between the car park and the emergency room building, from there the Gaslini of the future will be born: it will be built by private individuals, but it will always be under public management from a health point of view. A monoblock that will integrate with the central pavilion where there are now many departments and operating rooms. A hospital that </span><strong><span>will open to students with a University Campus</span></strong><span> , and to the neighborhood with a company nursery, a guesthouse for both students and the families of young patients, small commercial spaces serving the population that revolves around the Gaslini, spaces for sports and motor rehabilitation also open to the city. It will be up to the hospital to choose the project and entrust the construction: this model considerably reduces times and above all disputes. </span><strong><span>The hospital will be transformed into a health city and improve its international attractiveness</span></strong><span> . In line with the new organizational models approved by the Board of Directors on 12/13/2021, it is </span><strong><span>intended to design and build a hospital by intensity of care</span></strong><span> (high intensity, medium intensity and low intensity) where the effectiveness and efficiency of clinical processes can be pursued through the creation </span><strong><span>of common physical and organizational platforms</span></strong><span> (inpatient departments, clinical and research laboratories, outpatient activities, day and week surgery operating rooms, high technologies&#8230;). It is planned to create </span><strong><span>339 ordinary hospital beds, 36 day hospitals and 14 day surgery, as well as 66 technical beds</span></strong><span> (dialysis, nursery cots, etc.); all rooms will have one or two beds with toilet and bed for the companion. 10 operating rooms are planned </span><strong><span>, including 1 for emergencies and 1 hybrid</span></strong><span> . Finally, it is planned to renew and strengthen the current technological park” explains the </span><strong><span>general director of the Gaslini hospital Renato Botti.</span></strong></p>
<p><span>“It is important to point out that </span><strong><span>those for which proposals are requested are the same technical and maintenance services for which today the hospital already pays for external services with a view to quality</span></strong><span> . The construction of the new building is necessary both from the point of view of clinical risk, overcoming the fragmentation of activities between pavilions, and to increase economies of scale deriving, on the one hand, from savings on the energy bill (which is also intended to be greener ) and the optimization of spaces and paths. It is important to specify that </span><strong><span>this phase of notification to the market is functional to receiving proposals which only subsequently</span></strong><span> &#8211; and only if they pass both an economic and health assessment &#8211; </span><strong><span>are put up for public tender</span></strong><span> ” underlines the </span><strong><span>general director Renato Botti</span></strong><span> .</span></p>
<p>&nbsp;</p>
<p><strong><span>INSIGHTS</span></strong></p>
<p><span>The strategic objectives that IRCCS Gaslini pursues in restructuring and strengthening its offering of services, in particular by equipping itself with a modern integrated center with high technological intensity for intensive care, in line with the specific regulations and authorizations of the sector and according innovative design ideas and visions are:</span></p>
<p><span>1. contribute to environmental sustainability (zero impact orientation &#8211; green building), also through greater use of renewable energy sources and reduction of dependence on methane;</span></p>
<p><span>2. improve effectiveness and efficiency, supporting the necessary and no longer postponable reduction in clinical risk, which is determined by the fragmentation of services between multiple buildings;</span></p>
<p><span>3. adapt the structure of the offer to the most advanced acquisitions, in terms of assistance and research for the treatment of pediatric patients, both by introducing those requirements of flexibility of environments and technological equipment, such as to make it possible to adapt to future needs dependent on the evolution of scientific knowledge, or on extraordinary emergency conditions (e.g. pandemic plan), and by optimally combining care and research spaces for the growth of scientific excellence;</span></p>
<p><span>4. achieve better and greater accessibility and usability for the families of young patients;</span></p>
<p><span>5. contribute to territorial development, improving its attractiveness and competitive capacity, with the integration of complementary services aimed at the population of the IRCCS Gaslini (patients, families, operators), also considering that the IRCCS Gaslini, in addition to being site of university training, with students from other regions, it is already a reference center for rare and highly complex diseases and a component of 12 ERN networks &#8211; European Reference Network;</span></p>
<p><span>6. foresee the creation of a real University Campus capable of offering spaces for teaching areas and services and spaces dedicated to students and teaching staff.</span></p>
<p><span>7. enhance and recover green areas, with attention to the redevelopment of the existing building heritage, together with the redevelopment of local services.</span></p>
<p><span>On the basis of the aforementioned 2021-2025 Strategic Plan, the site of the new building is identified within the land owned by Gaslini and involves a spending commitment that should not exceed 137.5 million euros.</span></p>
<p><span>The Giannina Gaslini Institute, which starts with a budget of 35 million of which 10 allocated by the Gerolamo Gaslini Foundation, has already defined the times of the operation: the construction site will start by the summer of 2023 and the hospital will be ready between May and June 2026.</span></p>
<p><span>Whoever wins the tender (by 31 March 2023) will secure the concession of services for at least twenty years, which will be the investors&#8217; core business. The tender includes the demolition of pavilions 7 and 8, the redevelopment of spaces inside the citadel and the creation of a guesthouse for families and students. recalls that the law requires that PPP operations must provide for an overall contribution of private capital equal to at least 51% of the overall amount of the operation; on the other hand, the &#8220;public&#8221; capital must be equal to or lower than 49%. In the New Gaslini hypothesis, public capital is, at present, around 25%.</span></p>
<p><span>The area, the subject of the construction of Pavilion Zero, is the area between via Redipuglia, the underground car park adjacent to pavilion 20, pavilion 17-DEA and the property boundaries with the building in via Redipuglia n.18. The area, already intended for services &#8211; which, therefore, would not change its urban destination &#8211; is approximately 5,700m2. Approximately 74,700m3 would be built on the area, including a basement. In addition to this construction, it is planned to expand part of the parking lot adjacent to the basement floors of the new building. Among the variables being evaluated will be the time (measured in years of operation) for granting management of the Institute&#8217;s facility management and energy supply services (between 20 and 25 years).</span></p>
<p><span>The fee for these services will be included in the availability fee proposed by the economic operators which will also cover the investment and financing costs linked to the work.</span></p>
<p><strong><span>Complementary services for new public functions</span></strong></p>
<p><span>The IRCCS Gaslini carried out a preliminary check with the institutions involved to confirm the possible functional destinations referred to in table 1. It is specified that on the basis of the program agreement (currently being signed) with the following institutions: Liguria Region, Municipality of Genoa, Superintendence of Archaeology, Fine Arts and Landscape for the metropolitan city of Genoa and the province of La Spezia, the Local Health Authority n. 3 Genovese, </span><u><span>the total usable surface area intended for complementary services cannot exceed 30% of the usable surface area of ​​the entire hospital complex. </span></u><span>The permitted uses, indicated in Table 1, are considered accessory functions to the main one. Therefore, the changes from the current intended use do not entail the need for changes to the urban planning, including small sales areas with parapharmacy and/or type of articles aimed at families/operators &#8211; classifiable as &#8220;neighborhood businesses&#8221; (commercial activities retail for a net sales area of ​​less than or equal to 250 m2).</span></p>
<p><span>Table 1 &#8211; List of complementary services for new public functions, with order of priority.</span><br /><strong><span>Potential intended uses</span></strong></p>
<p><strong> </strong></p>
<table width="642">
<tbody>
<tr>
<td width="642"> </td>
</tr>
<tr>
<td width="642"><span>1. Guesthouse (mini-apartments with bathroom and breakfast nook and shared services: laundry, television rooms, games room, gym, co-working room)</span></td>
</tr>
<tr>
<td width="642"><span>to. families on the move</span></td>
</tr>
<tr>
<td width="642"><span>b. learners in training</span></td>
</tr>
<tr>
<td width="642"><span>c. researchers</span></td>
</tr>
<tr>
<td width="642"><span>d. clinical teams for in situ collaborations</span></td>
</tr>
<tr>
<td width="642"><span>And. solvents awaiting diagnosis</span></td>
</tr>
<tr>
<td width="642"><span>2. Small sales areas with parapharmacy and/or type of items aimed at families/operators &#8211; classifiable as Neighborhood Businesses (retail business for a net sales area of ​​less than or equal to 250 m2)</span></td>
</tr>
<tr>
<td width="642"><span>3. Company nursery and nursery with community center for the elderly with common socialization spaces (in compliance with prevention practices) &#8211; “Kid Therapy”</span></td>
</tr>
<tr>
<td width="642"><span>4. Spaces for voluntary associations</span></td>
</tr>
<tr>
<td width="642"><span>5. Structure for sporting activities for motor and/or rehabilitation purposes</span></td>
</tr>
<tr>
<td width="642"><span>6. NPIA therapeutic-rehabilitative structures for children and adolescents</span></td>
</tr>
<tr>
<td width="642"><strong><span>7.    </span></strong><span>Citizen&#8217;s help desk (e.g. one-stop-shop for Social Secretariat and Single Access Point)</span></td>
</tr>
<tr>
<td width="642"><span>8. Cinema room/Theatre space/concert room</span></td>
</tr>
<tr>
<td width="642"><span>9. Citadel of Human Health Sciences, the Environment, Animal Welfare – One health House (playful-educational space with experiential activities, bookshop, cafeteria) – including any spaces for the School in the Hospital</span></td>
</tr>
<tr>
<td width="642"><span>10. Sensory rooms</span></td>
</tr>
<tr>
<td width="642"><span>11. Incubator for start-ups in the Life Science/Living Lab sector with new technology training center</span></td>
</tr>
</tbody>
</table>
<p><strong> </strong></p>
<p><strong><u><span>Timetable</span></u></strong></p>
<table width="654">
<tbody>
<tr>
<td width="453"><span>Presentation to the Board of Directors for approval of the notice</span></td>
<td width="200"><span>February 21, 22</span></td>
</tr>
<tr>
<td width="453"><span>Publication on the website and sending to GURI and GUUE</span></td>
<td width="200"><strong> </strong></td>
</tr>
<tr>
<td width="453"><span>Information day (collective)</span></td>
<td width="200"><span>15 March 22</span></td>
</tr>
<tr>
<td width="453"><span>Window for inspections</span></td>
<td width="200"><strong> </strong></td>
</tr>
<tr>
<td width="453"><span>Deadline for submitting proposals</span></td>
<td width="200"><span>30 June 22</span></td>
</tr>
<tr>
<td width="453">
<p><span>Deadline for evaluation of proposals and declaration of feasibility</span></p>
<p><strong> </strong></p>
</td>
<td width="200"><span>15 October 22</span></td>
</tr>
<tr>
<td width="453"><span>Publication of tender documents</span></td>
<td width="200"><span>November 30, 22</span></td>
</tr>
<tr>
<td width="453"><span>Award</span></td>
<td width="200"><span>31 March 2023 (no later than May 2023</span></td>
</tr>
</tbody>
</table>
<p><strong> </strong></p>
<p><strong> </strong></p>
<p><strong> </strong></p>
<p><strong> </strong></p>
<p><strong> </strong></p>
</div>
</div>
</div>
<div id="panel-86037-0-0-1" class="so-panel widget widget_sow-video panel-last-child" data-index="1">
<div class="so-widget-sow-video so-widget-sow-video-default-f379b959fc93-86037">
<div class="sow-video-wrapper no-controls"> </div>
</div>
</div></div>
			</div><div class="et_pb_module et_pb_video et_pb_video_0">
				
				
				
				
				<div class="et_pb_video_box"><iframe loading="lazy" title="Renato Botti -  Piano strategico IGG" width="1080" height="608" src="https://www.youtube.com/embed/8ELfBgQK8ss?feature=oembed"  allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></div>
				
			</div>
			</div><div class="et_pb_with_border et_pb_column_1_4 et_pb_column et_pb_column_31  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_15  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>PRESS RELEASE</h3></div>
			</div><div class="et_pb_module et_pb_blog_7 et_pb_posts et_pb_bg_layout_light ">
				
				
				
				
				<div class="et_pb_ajax_pagination_container">
					
			<article id="post-1032" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_7_0 post-1032 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-1080x675.jpg" alt="Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-980x664.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/">Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero</a></h2>
				
					<p class="post-meta"><span class="published">23 Oct 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"><p>Firmato l’accordo di concessione delle aree per la costruzione: partono i cantieri di lavoro per la costruzione del Nuovo Gaslini.</p>
</div></div>			
			</article>
				
			<article id="post-1038" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_7_1 post-1038 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-1080x675.jpg" alt="The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-980x613.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-480x300.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/">The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi</a></h2>
				
					<p class="post-meta"><span class="published">10 Jul 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1062" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_7_2 post-1062 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg" alt="The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-480x476.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/">The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;</a></h2>
				
					<p class="post-meta"><span class="published">18 Apr 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1074" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_7_3 post-1074 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg" alt="The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-980x661.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-480x324.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/">The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros</a></h2>
				
					<p class="post-meta"><span class="published">8 Mar 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-911" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_7_4 post-911 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/nuovo-gasl-slide-1.png" alt="The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/">The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure</a></h2>
				
					<p class="post-meta"><span class="published">15 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-929" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_7_5 post-929 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-1080x675.jpg" alt="Gaslini has chosen the Public Interest Proposal for the New Hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-980x680.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-480x333.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/">Gaslini has chosen the Public Interest Proposal for the New Hospital</a></h2>
				
					<p class="post-meta"><span class="published">14 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-941" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_7_6 post-941 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/DSC_8430-1080x675.jpg" alt="Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/">Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)</a></h2>
				
					<p class="post-meta"><span class="published">18 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-973" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_7_7 post-973 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Renato-Botti-Direttore-Generale-Istituto-Giannina-Gaslini-1080x675.jpg" alt="The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/">The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million</a></h2>
				
					<p class="post-meta"><span class="published">2 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1026" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_7_8 post-1026 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg" alt="The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/">The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital</a></h2>
				
					<p class="post-meta"><span class="published">20 Jul 2021</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				<div><div class="pagination clearfix">
	<div class="alignleft"></div>
	<div class="alignright"></div>
</div></div></div>
				</div>
				 
			</div>
				
				
				
				
			</div>
				
				
			</div>
<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/">The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital</title>
		<link>https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Tue, 20 Jul 2021 10:26:35 +0000</pubDate>
				<category><![CDATA[comunicato stampa]]></category>
		<guid isPermaLink="false">https://www.cantierenuovogaslini.org/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/</guid>

					<description><![CDATA[<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/">The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="et_pb_section et_pb_section_8 et_section_regular" >
				
				
				
				
				
				
				<div class="et_pb_row et_pb_row_16">
				<div class="et_pb_column et_pb_column_1_2 et_pb_column_32  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_16 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					
				</div>
				
			</div>
			</div><div class="et_pb_column et_pb_column_1_2 et_pb_column_33  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_post_title et_pb_post_title_17 et_pb_bg_layout_light  et_pb_text_align_left"   >
				
				
				
				
				
				<div class="et_pb_title_container">
					<h1 class="entry-title">The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital</h1>
				</div>
				
			</div>
			</div>
				
				
				
				
			</div><div class="et_pb_row et_pb_row_17">
				<div class="et_pb_column et_pb_column_3_4 et_pb_column_34  et_pb_css_mix_blend_mode_passthrough">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_16  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><p><span>Genoa, 10 July 2021. The Board of Directors of the Gerolamo Gaslini Foundation, chaired by the Archbishop of Genoa, Monsignor Marco Tasca, today decided to start the renovation of the hospital through the provision of a contribution of 10 million euros to the Giannina Gaslini Institute, aimed at designing the new building envisaged in the 2021-2025 Strategic Plan of the Genoese pediatric hospital.</span></p>
<p><span>“The expected economic effort is considerable and the Institute will work to find the necessary resources by taking advantage of all available financing opportunities, however the contribution of the Gerolamo Gaslini Foundation is fundamental, as it has always been in the history of the Hospital, for the realization of of this very important moment of renewal. We are grateful to our Archbishop Mon. Marco Tasca, president of the Gaslini Foundation and to the entire board for the trust placed in us, which allows us to begin the work of transforming and relaunching the hospital as soon as possible&#8221; declared the president of the Giannina Gaslini Institute, Edoardo Garrone on the sidelines of the Board of Directors of the Gaslini Foundation.</span></p>
<p><span>“To arrive at the realization of the project in a short time, a rapid completion of the design phase is necessary, as a precondition for accessing the PNRR funds, which requires the works to be completed by 2026. In fact, there are several points of contact between the “ missions&#8221; of the PNRR and the creation of the new building and the Strategic Plan more generally (digitalisation, innovation and security in the PA, energy efficiency and redevelopment of buildings, proximity networks, structures and telemedicine for local healthcare, among others ). This important donation to the Institute by the Gerolamo Gaslini Foundation will allow us to better seize the funding sources accessible in the current economic context, including those deriving from the National Recovery and Resilience Plan, with respect to which it is important to proceed with the maximum speed in the creation of an overall Master Plan for the transformation of the entire pediatric hospital, of the executive project of the new building, of its validation and of the Project Management for Construction activities&#8221; explains the general director of the Giannina Gaslini Institute, Renato Botti.</span></p>
<p><span>The Strategic Plan of the Pediatric Institute approved in May by the Board of Directors for the five-year period 2021 &#8211; 2025, envisaged the creation of important infrastructural works for the modernization of the Hospital, functional to maintaining excellence, and with a view to further development, of healthcare services and research activities.</span></p>
<p><span>A new building construction is envisaged which is configured as a reconstruction intervention of a group of buildings, in order to concentrate the construction site in specific areas, limit construction times and give the architectural flexibility to the garrison, which only a new construction can guarantee .</span></p>
<p><span>The current pavilions 7 and 8 will be demolished, replaced with a new building of considerable size, between pavilion 17-DEA and via Redipuglia.</span></p>
<p><span><span class="">The new building will accommodate approximately half of the Institute&#8217;s acute beds, distributed over three floors above ground, which stand out above a logistical plate, also including the laboratories on 2 basement floors, starting from a level lower than the ground floor of the building 17, with which it would be in continuity, forming a single body.</span></span></p></div>
			</div>
			</div><div class="et_pb_with_border et_pb_column_1_4 et_pb_column et_pb_column_35  et_pb_css_mix_blend_mode_passthrough et-last-child">
				
				
				
				
				<div class="et_pb_module et_pb_text et_pb_text_17  et_pb_text_align_left et_pb_bg_layout_light">
				
				
				
				
				<div class="et_pb_text_inner"><h3>PRESS RELEASE</h3></div>
			</div><div class="et_pb_module et_pb_blog_8 et_pb_posts et_pb_bg_layout_light ">
				
				
				
				
				<div class="et_pb_ajax_pagination_container">
					
			<article id="post-1032" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_8_0 post-1032 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-1080x675.jpg" alt="Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-980x664.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/cantierenuovogaslini-render-facciata-1-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-construction-sites-begin-for-the-construction-of-pavilion-zero/">Nuovo Gaslini: construction sites begin for the construction of Padiglione Zero</a></h2>
				
					<p class="post-meta"><span class="published">23 Oct 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"><p>Firmato l’accordo di concessione delle aree per la costruzione: partono i cantieri di lavoro per la costruzione del Nuovo Gaslini.</p>
</div></div>			
			</article>
				
			<article id="post-1038" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_8_1 post-1038 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-1080x675.jpg" alt="The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-980x613.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Garrone-Botti-1-480x300.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-awards-the-tender-for-the-construction-of-the-new-gaslini-to-cmb-mieci-arcoservizi/">The Giannina Gaslini Institute awards the tender for the construction of the &#8220;new Gaslini&#8221; to Cmb/Mieci/Arcoservizi</a></h2>
				
					<p class="post-meta"><span class="published">10 Jul 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1062" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_8_2 post-1062 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg" alt="The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-713x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Cattura-480x476.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-giannina-gaslini-institute-publishes-the-tender-for-the-construction-of-the-nuovo-gaslini/">The Giannina Gaslini Institute publishes the tender for the construction of the &#8220;Nuovo Gaslini&#8221;</a></h2>
				
					<p class="post-meta"><span class="published">18 Apr 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1074" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_8_3 post-1074 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg" alt="The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-1080x675.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-980x661.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Nuovo-padiglione-Zero-Gaslini-480x324.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-approves-a-further-allocation-of-10-million-euros-for-the-construction-of-the-new-gaslini-bringing-its-contribution-to-20-million-euros/">The Gerolamo Gaslini Foundation approves a further allocation of 10 million euros for the construction of the new Gaslini, bringing its contribution to 20 million euros</a></h2>
				
					<p class="post-meta"><span class="published">8 Mar 2023</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-911" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_8_4 post-911 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/nuovo-gasl-slide-1.png" alt="The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/selezionato-il-soggetto-promotore-per-la-concessione-di-costruzione-e-gestione-del-nuovo-padiglione-zero-e-dellammodernamento-dalla-struttura-ospedaliera-esistente-del-gaslini/">The Promoter body selected for the concession for the construction and management of the new Pavilion Zero and the modernization of the existing Gaslini hospital structure</a></h2>
				
					<p class="post-meta"><span class="published">15 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-929" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_8_5 post-929 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-1080x675.jpg" alt="Gaslini has chosen the Public Interest Proposal for the New Hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-980x680.jpg 980w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/ingresso-2048x1422-1-480x333.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/gaslini-has-chosen-the-public-interest-proposal-for-the-new-hospital/">Gaslini has chosen the Public Interest Proposal for the New Hospital</a></h2>
				
					<p class="post-meta"><span class="published">14 Nov 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-941" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_8_6 post-941 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/DSC_8430-1080x675.jpg" alt="Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/nuovo-gaslini-32-requests-to-participate-for-the-information-day-for-the-solicitation-of-proposals-in-public-private-partnerships-ppp/">Nuovo Gaslini: 32 requests to participate for the information day for the solicitation of proposals in public-private partnerships (PPP)</a></h2>
				
					<p class="post-meta"><span class="published">18 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-973" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_8_7 post-973 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/Renato-Botti-Direttore-Generale-Istituto-Giannina-Gaslini-1080x675.jpg" alt="The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million" class="" width="1080" height="675" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-market-consultation-through-solicitation-of-proposals-in-public-private-partnership-ppp-published-today-by-irccs-gaslini-for-the-concession-for-the-modernization-of-its-hospital-structure-is-wor/">The market consultation through solicitation of proposals in public-private partnership (PPP) published today by IRCCS Gaslini for the concession for the modernization of its hospital structure is worth 137 million</a></h2>
				
					<p class="post-meta"><span class="published">2 Mar 2022</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				
			<article id="post-1026" class="et_pb_post clearfix et_pb_has_overlay et_pb_blog_item_8_8 post-1026 post type-post status-publish format-standard has-post-thumbnail hentry category-comunicato-stampa-en">

				<a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/" class="entry-featured-image-url"><img loading="lazy" decoding="async" src="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg" alt="The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital" class="" width="1080" height="675" srcset="https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3.jpg 1080w, https://cantierenuovogaslini.gaslini.org/wp-content/uploads/rsz_presidenza_3-480x325.jpg 480w" sizes="auto, (min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) 1080px, 100vw" /><span class="et_overlay"></span></a>
														<h2 class="entry-title"><a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/">The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital</a></h2>
				
					<p class="post-meta"><span class="published">20 Jul 2021</span></p><div class="post-content"><div class="post-content-inner et_multi_view_hidden"></div></div>			
			</article>
				<div><div class="pagination clearfix">
	<div class="alignleft"></div>
	<div class="alignright"></div>
</div></div></div>
				</div>
				 
			</div>
				
				
				
				
			</div>
				
				
			</div>
<p>L'articolo <a href="https://cantierenuovogaslini.gaslini.org/en/the-gerolamo-gaslini-foundation-donates-10-million-euros-to-the-giannina-gaslini-institute-for-the-executive-project-of-the-new-hospital/">The Gerolamo Gaslini Foundation donates 10 million euros to the Giannina Gaslini Institute for the executive project of the new hospital</a> proviene da <a href="https://cantierenuovogaslini.gaslini.org/en/">Cantiere Nuovo Gaslini</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
